EV charging stations in Arcachon
8 public charging sites with 52 charge points are registered in Arcachon, including 1 DC fast-charging points. The most powerful points deliver up to 25 kW.
The largest operator is Réseau de recharge du groupe Indigo with 39 charge points; 5 operators are present in total.
At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- 4 Avenue de Verdun 33120 LA TESTE DE BUCHpar défaut : 0.4167€ par kwh de charge, par défaut : 6.0€ par heure d'occupation hors charge, 0.4167€ par kwh de charge, 6.0€ par heure d…
Other charging sites
AC charge points, sorted by number of points.
- 14 Rue Jéhenne 33120 Arcachon FRANCE
- Esplanade Georges Pompidou 33120 Arcachon FRANCE
- 9bis Av. du Parc, 33120 ArcachonDirections
- 9 Allée Alexandre Dumas, Arcachon 33120 France
- 5 Allée de la Galaxie, 33120 ArcachonDirections
Recently opened
- 10 Mar 2023 · 5 Allée de la Galaxie, 33120 Arcachon · 22 kW · RossiniEnergy
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in France
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bordeaux 952
- Mérignac 325
- La Teste-de-Buch 127
- Pessac 102
- Braud-et-Saint-Louis 100
- Arès 95
- Villenave-d'Ornon 83
- Langon 81
- Bègles 80
- Libourne 65
- Le Bouscat 62
- Floirac 61
Data: official national charge point register (15 October 2026). Data sources