Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Isère · France

EV charging stations in Meylan

11 public charging sites with 55 charge points are registered in Meylan, including 31 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 160 kW.

The largest operator is LIDL with 17 charge points; 7 operators are present in total.

At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.

Sites11
Charge points55
DC fast points31
150 kW and up4

Charge points by power

≤ 11 kW22
12–22 kW17
23–49 kW2
50–149 kW6
≥ 150 kW8

Operators

LIDL17
DREAM ENERGY16
DRIVECO6
ARTEPARC MEYLAN4
TotalEnergies Charge Rapide4
Grenoble-Alpes Métropole4
Airria4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • 22 Chemin Du Vieux Chêne - 38240 Meylan
    ARTEPARC MEYLAN160 kW4 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • RN 87, 38240 Meylan
    TotalEnergies Charge Rapide150 kW4 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • 1 bis Bd des Alpes, 38240 Meylan
    DRIVECO50 kW6 pointsCCS, CHAdeMO, Type 2
    Directions
  • 7a chemin de la Dhuy 38240 Meylan
    Airria11 kW4 pointsCHAdeMO, Type 224/7
    0,3€/kWh + 0,03€/min entre 8h et 20h, 15€ la session entre 18h et 6h
    Directions
  • Chemin du Vieux Ch√™ne 22 38240 Meylan
    DREAM ENERGY7 kW16 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Impasse des centaurées, 38240 Meylan
    LIDL22 kW17 pointsdomestic socket, Type 2
    0,29€ / kWh
    Directions
  • 0 Avenue de la plaine fleurie, 38240 MEYLAN
    Grenoble-Alpes Métropole22.1 kW2 pointsType 2
    Directions
  • Avenue de Verdun, 38240 MEYLAN
    Grenoble-Alpes Métropole7.4 kW2 pointsType 2
    Directions

Recently opened

  • 29 Sept 2025 · Chemin du Vieux Ch√™ne 22 38240 Meylan · 7 kW · DREAM ENERGY
  • 17 Jul 2023 · 1 bis Bd des Alpes, 38240 Meylan · 50 kW · DRIVECO
  • 22 Jun 2023 · RN 87 · 150 kW · TotalEnergies Charge Rapide
  • 17 Nov 2022 · 22 Chemin Du Vieux Chêne - 38240 Meylan · 160 kW · ARTEPARC MEYLAN
  • 1 Jan 2022 · Impasse des centaurées · 22 kW · LIDL

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (15 October 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET