Ille-et-Vilaine · France

EV charging stations in Pacé

9 public charging sites with 53 charge points are registered in Pacé, including 15 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is IKEA with 32 charge points; 5 operators are present in total.

At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.

Sites9
Charge points53
DC fast points15
150 kW and up12

Charge points by power

≤ 11 kW0
12–22 kW0
23–49 kW34
50–149 kW7
≥ 150 kW12

Operators

IKEA32
Atlante8
Power Dot France7
ELECTRA4
OUEST CHARGE2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Route de Saint Brieuc, Pacé 35740 France
    Atlante300 kW8 pointsCCS24/7
  • 7 Av. des Touches, 35740 Pacé
    ELECTRA300 kW4 pointsCCS24/7
  • 46PJ+XR Pacé, France
    Power Dot France50 kW7 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • 14 Avenue des Touches 35740 Pacé
    IKEA24 kW32 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • 2 esplanade charles de gaulle 35740 PACE
    OUEST CHARGE36 kW2 pointsdomestic socket, Type 224/7
    Directions

Recently opened

  • 21 Jan 2025 · 7 Av. des Touches, 35740 Pacé · 300 kW · ELECTRA
  • 9 Feb 2024 · 14 Avenue des Touches 35740 Pacé · 24 kW · IKEA
  • 21 Jun 2021 · 46PJ+XR Pacé, France · 50 kW · Power Dot France
  • 1 Jan 2021 · 2 esplanade charles de gaulle 35740 PACE · 36 kW · OUEST CHARGE

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (15 October 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET