Day-ahead today06:40€/MWh
NL141.8▲ +509.7%DE-LU116.6▲ +788.6%AT242.0▲ +9.2%BE162.6▲ +645.8%FR153.6▲ +506.4%PL210.7▲ +171.6%CZ193.7▲ +78.1%HU267.4▲ +2.9%SI238.5▲ +20.0%CH237.0▲ +6.2%IT-NORD250.2▲ +7.1%DK191.2▲ +757.6%DK289.8▲ +608.3%NO296.0▲ +66.1%SE310.4▲ +502.1%SE470.1▲ +800.3%ES196.9▲ +76.0%PT196.9▲ +76.0%GB141.5▲ +289.5%
MethodologyAbout & contact
Savoie · France

EV charging stations in Saint-Jean-de-Maurienne

14 public charging sites with 28 charge points are registered in Saint-Jean-de-Maurienne, including 12 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 250 kW.

The largest operator is TESLA SUPERCHARGER with 8 charge points; 7 operators are present in total.

At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.

Sites14
Charge points28
DC fast points12
150 kW and up10

Charge points by power

≤ 11 kW0
12–22 kW14
23–49 kW0
50–149 kW3
≥ 150 kW11

Operators

TESLA SUPERCHARGER8
SOWATT SOLUTIONS6
Borne KASEDA ACE04203365
Réseau de recharge LE SUN3
LIDL2
ACE ACE06945152
Borne ACE06945192

Fast-charging sites

Sites with DC charge points, sorted by power.

  • 371 Avenue d'Italie, 73300 Saint-Jean-de-Maurienne
    TESLA SUPERCHARGER250 kW8 pointsCCS24/7
    Directions
  • 839 Avenue du 8 mai 1945 73300 Saint-Jean de Maurienne
    SOWATT SOLUTIONS224 kW3 pointsCCS, Type 2
    0,54 € TTC / kWh
    Directions
  • 332 Rue du Grand Arc 73300 Saint-Jean de Maurienne
    SOWATT SOLUTIONS50 kW3 pointsCCS, CHAdeMO, Type 2
    0,54 € TTC / kWh
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE
    Borne KASEDA ACE042033622 kW5 pointsType 224/7
  • 388 Avenue du Mont Cenis 73300 Saint-Jean-de-Maurienne
    Réseau de recharge LE SUN22 kW3 pointsdomestic socket, Type 224/7
    Directions
  • 8 Rue du 8 Mai 1945, 73300 Saint-Jean-de-Maurienne
    LIDL22 kW2 pointsdomestic socket, Type 224/7
    0,29€ / kWh
    Directions
  • av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE
    ACE ACE069451522 kW2 pointsType 224/7
  • av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE
    Borne ACE069451922 kW2 pointsType 224/7

Recently opened

  • 8 Sept 2026 · Av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE · 22 kW · Borne KASEDA ACE0420336
  • 8 Sept 2026 · av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE · 22 kW · Borne ACE0694519
  • 28 Jan 2026 · av du 8 mai 1945 2, 73300 SAINT-JEAN-DE-MAURIENNE · 22 kW · ACE ACE0694515
  • 7 Oct 2024 · 839 Avenue du 8 mai 1945 73300 Saint-Jean de Maurienne · 224 kW · SOWATT SOLUTIONS
  • 27 Dec 2023 · 8 Rue du 8 Mai 1945 · 22 kW · LIDL

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (25 October 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET