EV charging stations in Tourville-la-Rivière
19 public charging sites with 68 charge points are registered in Tourville-la-Rivière, including 23 DC fast-charging points and 19 delivering at least 150 kW. The most powerful points deliver up to 600 kW.
The largest operator is IKEA with 24 charge points; 8 operators are present in total.
At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- 139 Rue de l'Île Coquet 76410 Tourville-la-RivièreDirections
- Carrefour Tourville La Riviere, 2 Avenue Gustave Picard, 76410 Tourville-la-RivičreDirectionsHPC 59cts/Kwh
- 139 Rue de l'Île Coquet, Tourville-la-Rivière 76410 France
- Zac Clos Aux Antes 76410 Tourville-la-RivièreDirections
- Rue de l’Île Adam, Tourville-la-Rivière 76410 France
Other charging sites
AC charge points, sorted by number of points.
- Avenue Gustave Picard 76410 Tourville-la-RivièreDirections
- 1 Rue Parc en Seine 76410 Tourville-la-RivièreDirections
- 2 Avenue Gustave Picard, Tourville-la-Rivière 76410 France
- Place De La Poste 0, 76410 TOURVILLE-LA-RIVIEREDirections
- Centre Commercial Carrefour 76410 Tourville-la-RiviereDirections
Recently opened
- 21 Aug 2026 · Place De La Poste 0, 76410 TOURVILLE-LA-RIVIERE · 22.1 kW · Métropole Rouen Normandie
- 9 Feb 2024 · Zac Clos Aux Antes 76410 Tourville-la-Rivière · 200 kW · Izivia Express
- 1 Jan 2024 · 1 Rue Parc en Seine 76410 Tourville-la-Rivière · 22 kW · Réseau de recharge SEVDEC
- 1 Jan 2024 · Centre Commercial Carrefour 76410 Tourville-la-Riviere · 22 kW · Réseau de recharge SEVDEC
- 24 Aug 2023 · Avenue Gustave Picard 76410 Tourville-la-Rivière · 7 kW · IKEA
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in France
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Le Havre 378
- Rouen 244
- Gonfreville-l'Orcher 117
- Le Grand-Quevilly 104
- Saint-Étienne-du-Rouvray 99
- Barentin 96
- Dieppe 86
- Petit-Caux 80
- Harfleur 73
- Mont-Saint-Aignan 54
- Montivilliers 54
- Le Petit-Quevilly 51
Data: official national charge point register (15 October 2026). Data sources