EV charging stations in Altötting
44 public charging sites with 83 charge points are registered in Altötting, including 17 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Energie Südbayern GmbH with 49 charge points; 12 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Burghauser Str. 83-85, 84503 AltöttingDirections
- Fabrikstr. 17, 84503 AltöttingDirections
- Bahnhofstraße 38, 84503 AltöttingDirections
- Mühldorfer Straße 112, 84503 AltöttingDirections
- Dultplatz 2, 84503 AltöttingDirections
- Marienstr. 9, 84503 AltöttingDirections
- Mühldorfer Straße 88, 84503 AltöttingDirections
Other charging sites
AC charge points, sorted by number of points.
- Vinzenz-von-Paul-Str. 8, 84503 AltöttingDirections
- Trostberger Str. 5, 84503 AltöttingDirections
- Kolbergstr. 6, 84503 AltöttingDirections
- Vinzenz-von-Paul-Str. 10, 84503 AltöttingDirections
- Bahnhofstr. 7-13, 84503 AltöttingDirections
- Bahnhofplatz 1, 84503 AltöttingDirections
- Bahnhofplatz 1, 84503 AltöttingDirections
- Tüßlinger Str. 1, 84503 AltöttingDirections
- Bahnhofplatz 1, 84503 AltöttingDirections
- Simon-Dach-Platz 6, 84503 AltöttingDirections
- Burghauser Str. 50, 84503 AltöttingDirections
- Burghauser Str. 69, 84503 AltöttingDirections
- Kapellplatz 2A, 84503 AltöttingDirections
- Kapellplatz 2, 84503 AltöttingDirections
- Maria-Ward-Str. 9, 84503 AltöttingDirections
- Maria-Ward-Straße 11, 84503 AltöttingDirections
- Burghauser Str. 4a, 84503 AltöttingDirections
Recently opened
- 1 Jul 2026 · Bahnhofstr. 7-13 · 22 kW · Sparkasse Altötting-Mühldorf
- 5 Nov 2024 · Burghauser Str. 4a · 22 kW · smopi
- 19 Sept 2024 · Kapellplatz 2A · 22 kW · Energie Südbayern GmbH
- 5 Sept 2024 · Fabrikstr. 17 · 150 kW · EnBW mobility+ AG und Co.KG
- 5 Aug 2024 · Bahnhofplatz 1 · 22 kW · Energie Südbayern GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
Data: official national charge point register (1 September 2026). Data sources