EV charging stations in Bad Säckingen
38 public charging sites with 85 charge points are registered in Bad Säckingen, including 17 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 150 kW.
The largest operator is Stadtwerke Bad Säckingen GmbH with 51 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Buchrain 4, 79713 Bad SäckingenDirections
- Schulhausstr. 40, 79713 Bad SäckingenDirections
- Glarnerstraße 4, 79713 Bad SäckingenDirections
- Tullastr. 4, 79713 Bad SäckingenDirections
- Tullastr. 12, 79713 Bad SäckingenDirections
- Schaffhauser Str. 90, 79713 Bad SäckingenDirections
- Austr. 32, 79713 Bad SäckingenDirections
- Langfuhren 12, 79713 Bad SäckingenDirections
Other charging sites
AC charge points, sorted by number of points.
- Lohgerbe 19, 79713 Bad SäckingenDirections
- Albert-Gerspach-Allee 8, 79713 Bad SäckingenDirections
- Trottäcker 48, 79713 Bad SäckingenDirections
- Bergseestr. 0, 79713 Bad SäckingenDirections
- Bauvereinstr. 19, 79713 Bad SäckingenDirections
- Mühlenweg 2, 79713 Bad SäckingenDirections
- Nagaistraße 3, 79713 Bad SäckingenDirections
- Werderstr. 5, 79713 Bad SäckingenDirections
- Im Grütt 14, 79713 Bad SäckingenDirections
- Ringstr. 26, 79713 Bad SäckingenDirections
- Hauptstr. 60, 79713 Bad SäckingenDirections
- Am Buchrain 17, 79713 Bad SäckingenDirections
- Unter dem Dorf 11, 79713 Bad SäckingenDirections
- Lochmühleweg 6, 79713 Bad SäckingenDirections
- Flößerstraße 11, 79713 Bad SäckingenDirections
Recently opened
- 12 Dec 2025 · Bergseestr. 0 · 22 kW · Stadtwerke Bad Säckingen GmbH
- 12 Dec 2025 · Mühlenweg 2 · 22 kW · Stadtwerke Bad Säckingen GmbH
- 8 Sept 2025 · Schaffhauser Str. 90 · 60 kW · Kaufland
- 20 May 2025 · Im Grütt 14 · 22 kW · Stadtwerke Bad Säckingen GmbH
- 7 May 2025 · Austr. 32 · 25 kW · Stadtwerke Bad Säckingen GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Waldshut-Tiengen 79
- Wehr 28
- Rheinfelden 30
- Schopfheim 30
- Lörrach 115
- Weil am Rhein 86
- Binzen 26
- Todtnau 34
- Schluchsee 32
- Müllheim 41
- Neuenburg am Rhein 51
- Horben 32
Data: official national charge point register (1 September 2026). Data sources