EV charging stations in Barsbüttel
43 public charging sites with 76 charge points are registered in Barsbüttel, including 40 DC fast-charging points and 38 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Regioladen+ with 30 charge points; 7 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rahlstedter Straße 1, 22885 BarsbüttelDirections
- Rahlstedter Str. 2, 22885 BarsbüttelDirections
- Am AKKU 9, 22885 BarsbüttelDirections
- Rahlstedter Str. 1, 22885 BarsbüttelDirections
- Hanskampring 1, 22885 BarsbüttelDirections
Other charging sites
AC charge points, sorted by number of points.
- Stemwarder Landstr. 17, 22885 BarsbüttelDirections
- Am Heidberg 1, 22885 BarsbüttelDirections
- Kronshorster Weg 2, 22885 BarsbüttelDirections
- Callingtonstr. 2, 22885 BarsbüttelDirections
- Am Sportplatz 5, 22885 BarsbüttelDirections
- Altes Feld 9, 22885 BarsbüttelDirections
- Von-Bronsart-Str. 12, 22885 BarsbüttelDirections
- Thorkoppel 12, 22885 BarsbüttelDirections
- Willinghusener Landstr. 14, 22885 BarsbüttelDirections
- Soltausredder 21, 22885 BarsbüttelDirections
- Achtern Barg 31, 22885 BarsbüttelDirections
- Hauptstraße 51, 22885 BarsbüttelDirections
- Falkenstr. 18a, 22885 BarsbüttelDirections
- Zum Dicken Busch 18a, 22885 BarsbüttelDirections
- Buchenstr. 30A, 22885 BarsbüttelDirections
- Hauptstraße 6G, 22885 BarsbüttelDirections
- Huuskoppel 24, 22885 BarsbüttelDirections
Recently opened
- 23 Dec 2025 · Rahlstedter Straße 1 · 400 kW · EnBW mobility+ AG und Co.KG
- 11 Dec 2025 · Am AKKU 9 · 300 kW · Jolt Energy GmbH
- 20 Nov 2025 · Altes Feld 9 · 22 kW · Regioladen+
- 12 Nov 2025 · Thorkoppel 12 · 22 kW · Regioladen+
- 12 Nov 2025 · Willinghusener Landstr. 14 · 22 kW · Regioladen+
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Reinbek 97
- Ahrensburg 96
- Glinde 79
- Bad Oldesloe 38
- Reinfeld 38
- Großhansdorf 35
- Oststeinbek 30
- Trittau 26
- Wentorf 26
Data: official national charge point register (1 September 2026). Data sources