Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Bautzen · Sachsen · Germany

EV charging stations in Bautzen

42 public charging sites with 73 charge points are registered in Bautzen, including 45 DC fast-charging points and 27 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Beteiligungs- und Betriebsgesellschaft Bautzen mbH with 15 charge points; 17 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites42
Charge points73
DC fast points45
150 kW and up27

Charge points by power

≤ 11 kW6
12–22 kW19
23–49 kW0
50–149 kW20
≥ 150 kW28

Operators

Beteiligungs- und Betriebsgesellschaft Bautzen mbH15
Aral Pulse10
Tesla Germany GmbH9
AKF Fahrzeugteile GmbH8
EWE Go GmbH4
EnBW mobility+ AG und Co.KG4
E.ON Drive Infrastructure4
E.ON Drive GmbH4
Park Your Truck GmbH2
Kaufland2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Kreckwitzer Straße 2, 02625 Bautzen
    Aral Pulse300 kW6 pointsCCS
    Directions
  • Kreckwitzer Str. 3, 02625 Bautzen
    EWE Go GmbH300 kW4 pointsCCS24/7
    Directions
  • Dresdener Str. 49C, 02625 Bautzen
    Aral Pulse300 kW4 pointsCCS24/7
    Directions
  • Niederkainaer Str. 14, 02625 Bautzen
    Tesla Germany GmbH250 kW9 pointsCCS24/7
    Directions
  • Schliebenstr. 24, 02625 Bautzen
    Beteiligungs- und Betriebsgesellschaft Bautzen mbH150 kW5 pointsCCS, Type 224/7
    Directions
  • Dresdener Str. 46, 02625 Bautzen
    EnBW mobility+ AG und Co.KG100 kW4 pointsCCS
    Directions
  • Löbauer Str. 60, 02625 Bautzen
    Park Your Truck GmbH55 kW2 pointsCCS, Type 2
    Directions
  • Am Stadtwall 4, 02625 Bautzen
    Beteiligungs- und Betriebsgesellschaft Bautzen mbH50 kW4 pointsCCS24/7
    Directions
  • Raststätte Oberlausitz Nord 0, 02625 Bautzen
    E.ON Drive Infrastructure50 kW2 pointsCCS
    Directions
  • Raststätte Oberlausitz Süd 0, 02625 Bautzen
    E.ON Drive Infrastructure50 kW2 pointsCCS
    Directions
  • Oberlausitz Nord 0, 02625 Bautzen
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Oberlausitz Süd 0, 02625 Bautzen
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Gesundbrunnenring 62, 02625 Bautzen
    Kaufland50 kW2 pointsCCS, Type 2
    Directions
  • Malschwitzer Str. 1, 02625 Bautzen
    Autohaus Bautzen Ost GmbH22 kW2 pointsCCS, Type 2
    Directions
  • Dresdener Str. 80, 02625 Bautzen
    Autohaus Bernhard Matticzk GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Dresdener Straße 70A, 02625 Bautzen
    AKF Fahrzeugteile GmbH22 kW8 pointsType 2
    Directions
  • Töpferstraße 16, 02625 Bautzen
    Beteiligungs- und Betriebsgesellschaft Bautzen mbH22 kW4 pointsType 2
    Directions
  • Äußere Lauenstr. 25, 02625 Bautzen
    Beteiligungs- und Betriebsgesellschaft Bautzen mbH22 kW2 pointsType 224/7
    Directions
  • Muskauer Str. 31, 02625 Bautzen
    Autohaus Ruffert GmbH11 kW2 pointsType 2
    Directions
  • Neusalzaer Str. 39, 02625 Bautzen
    Autohaus Büchner GmbH22 kW1 pointsType 2
    Directions
  • Fischergasse 6, 02625 Bautzen
    Charge and Co11 kW1 pointsType 224/7
    Directions
  • Fischergasse 10, 02625 Bautzen
    Charge and Co11 kW1 pointsType 224/7
    Directions
  • Nimschützer Straße 13, 02625 Bautzen
    Mario Hanke11 kW1 pointsType 2
    Directions
  • Erich-Klausnitzer-Straße 43, 02625 Bautzen
    Ronny Winter11 kW1 pointsType 2
    Directions

Recently opened

  • 18 May 2026 · Neusalzaer Str. 39 · 22 kW · Autohaus Büchner GmbH
  • 12 Jan 2026 · Am Stadtwall 4 · 50 kW · Beteiligungs- und Betriebsgesellschaft Bautzen mbH
  • 11 Dec 2025 · Kreckwitzer Str. 3 · 300 kW · EWE Go GmbH
  • 3 Nov 2025 · Niederkainaer Str. 14 · 250 kW · Tesla Germany GmbH
  • 22 Oct 2025 · Fischergasse 6 · 11 kW · Charge and Co

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET