EV charging stations in Bautzen
42 public charging sites with 73 charge points are registered in Bautzen, including 45 DC fast-charging points and 27 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Beteiligungs- und Betriebsgesellschaft Bautzen mbH with 15 charge points; 17 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Kreckwitzer Straße 2, 02625 BautzenDirections
- Kreckwitzer Str. 3, 02625 BautzenDirections
- Dresdener Str. 49C, 02625 BautzenDirections
- Niederkainaer Str. 14, 02625 BautzenDirections
- Schliebenstr. 24, 02625 BautzenDirections
- Dresdener Str. 46, 02625 BautzenDirections
- Löbauer Str. 60, 02625 BautzenDirections
- Am Stadtwall 4, 02625 BautzenDirections
- Raststätte Oberlausitz Nord 0, 02625 BautzenDirections
- Raststätte Oberlausitz Süd 0, 02625 BautzenDirections
- Oberlausitz Nord 0, 02625 BautzenDirections
- Oberlausitz Süd 0, 02625 BautzenDirections
- Gesundbrunnenring 62, 02625 BautzenDirections
- Malschwitzer Str. 1, 02625 BautzenDirections
- Dresdener Str. 80, 02625 BautzenDirections
Other charging sites
AC charge points, sorted by number of points.
- Dresdener Straße 70A, 02625 BautzenDirections
- Töpferstraße 16, 02625 BautzenDirections
- Äußere Lauenstr. 25, 02625 BautzenDirections
- Muskauer Str. 31, 02625 BautzenDirections
- Neusalzaer Str. 39, 02625 BautzenDirections
- Fischergasse 6, 02625 BautzenDirections
- Fischergasse 10, 02625 BautzenDirections
- Nimschützer Straße 13, 02625 BautzenDirections
- Erich-Klausnitzer-Straße 43, 02625 BautzenDirections
Recently opened
- 18 May 2026 · Neusalzaer Str. 39 · 22 kW · Autohaus Büchner GmbH
- 12 Jan 2026 · Am Stadtwall 4 · 50 kW · Beteiligungs- und Betriebsgesellschaft Bautzen mbH
- 11 Dec 2025 · Kreckwitzer Str. 3 · 300 kW · EWE Go GmbH
- 3 Nov 2025 · Niederkainaer Str. 14 · 250 kW · Tesla Germany GmbH
- 22 Oct 2025 · Fischergasse 6 · 11 kW · Charge and Co
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Kamenz 111
- Hoyerswerda 62
- Radeberg 38
- Bischofswerda 37
Data: official national charge point register (1 September 2026). Data sources