EV charging stations in Bergkamen
44 public charging sites with 76 charge points are registered in Bergkamen, including 44 DC fast-charging points and 34 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is E.ON Drive GmbH with 15 charge points; 15 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Hellweg 34, 59192 BergkamenDirections
- Landwehrstraße 68, 59192 BergkamenDirections
- Geschwister-Scholl-Straße 1, 59192 BergkamenDirections
- Werner Str. 123, 59192 BergkamenDirections
- Rünther Str. 151, 59192 BergkamenDirections
- Am Roggenkamp 3-5, 59192 BergkamenDirections
- Industriestr. 39, 59192 BergkamenDirections
- An der Bummannsburg 4-6, 59192 BergkamenDirections
- Ernst-Schering-Straße 14, 59192 BergkamenDirections
- An der Bummansburg 1, 59192 BergkamenDirections
- Rünther Str. 151, 59192 BergkamenDirections
- Werner Straße 117-119, 59192 BergkamenDirections
- Bambergstraße 116, 59192 BergkamenDirections
Other charging sites
AC charge points, sorted by number of points.
- Häupenweg 25, 59192 BergkamenDirections
- Ernst-Schering-Str. 14, 59192 BergkamenDirections
- Justus-von-Liebig-Str. 14, 59192 BergkamenDirections
- Rathausplatz 4, 59192 BergkamenDirections
- Rathenaustr. 10, 59192 BergkamenDirections
- Am Himmeldieck 10, 59192 BergkamenDirections
- Rünther Heide 24, 59192 BergkamenDirections
Recently opened
- 12 Aug 2026 · An der Bummannsburg 4-6 · 100 kW · EnBW mobility+ AG und Co.KG
- 14 Apr 2026 · Rünther Str. 151 · 50 kW · ALDI Nord
- 9 Dec 2025 · Am Roggenkamp 3-5 · 200 kW · EnBW mobility+ AG und Co.KG
- 21 Aug 2025 · Justus-von-Liebig-Str. 14 · 22 kW · E.ON Drive GmbH
- 19 Aug 2025 · Häupenweg 25 · 22 kW · Reload-Solution GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Schwerte 245
- Lünen 151
- Kamen 147
- Unna 82
- Holzwickede 54
- Werne 52
- Selm 51
- Fröndenberg 34
Data: official national charge point register (1 September 2026). Data sources