EV charging stations in Cuxhaven
45 public charging sites with 84 charge points are registered in Cuxhaven, including 30 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is EWE Go GmbH with 15 charge points; 22 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Papenstr. 139, 27472 CuxhavenDirections
- Brockeswalder Chaussee 67, 27474 CuxhavenDirections
- Grodener Chaussee 34, 27472 CuxhavenDirections
- Strichweg 50, 27472 CuxhavenDirections
- Papenstr. 145, 27472 CuxhavenDirections
- Grodener Chaussee 56, 27472 CuxhavenDirections
- Grodener Chaussee 80, 27472 CuxhavenDirections
- Grüner Weg 2-5, 27472 CuxhavenDirections
- Feldweg 21, 27474 CuxhavenDirections
- Papenstraße 126, 27472 CuxhavenDirections
- Hauptstraße 70, 27478 CuxhavenDirections
Other charging sites
AC charge points, sorted by number of points.
- Rohdestraße 6, 27472 CuxhavenDirections
- Cuxhavener Str. 87-89Directions
- Hohe Klint 32, 27478 CuxhavenDirections
- Vincent-Lübeck-Str. 2, 27474 CuxhavenDirections
- Drangstweg 0, 27474 CuxhavenDirections
- Drangstweg 84, 27474 CuxhavenDirections
- In den Dünen 2-4, 27476 CuxhavenDirections
- In den Dünen 2-4, 27476 CuxhavenDirections
- Rohdestr. 2, 27472 CuxhavenDirections
- Fährstrasse 2, 27472 CuxhavenDirections
- Alter Deichweg 11, 27472 CuxhavenDirections
- Papenstr. 71, 27472 CuxhavenDirections
- Papenstr. 152, 27472 CuxhavenDirections
- Abschnede 195, 27472 CuxhavenDirections
- Werner-Kammann-Str. 3-7, 27472 CuxhavenDirections
- Am Sahlenburger Strand 27, 27476 CuxhavenDirections
- Am Sahlenburger Strand 3, 27476 CuxhavenDirections
- Jenny-Lind-Str. 11, 27476 CuxhavenDirections
- Nordheimstr. 137, 27476 CuxhavenDirections
- Udendorfer Teil 29a, 27478 CuxhavenDirections
- Osterstr. 16, 27478 CuxhavenDirections
Recently opened
- 13 Apr 2026 · Hohe Klint 32 · 11 kW · Küsten Golfclub Hohe Klint e.V.
- 30 Dec 2025 · Am Sahlenburger Strand 3 · 11 kW · Marei Griffith
- 20 Dec 2025 · Osterstr. 16 · 7 kW · Janik Schmelcke
- 18 Dec 2025 · Cuxhavener Str. 87-89 · 22 kW · Wattif Europe GmbH
- 9 Dec 2025 · Brockeswalder Chaussee 67 · 200 kW · EnBW mobility+ AG und Co.KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Wurster Nordseeküste 42
- Hemmoor 37
- Otterndorf 36
- Geestland 33
Data: official national charge point register (1 September 2026). Data sources