Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Nürnberger Land · Bayern · Germany

EV charging stations in Feucht

41 public charging sites with 60 charge points are registered in Feucht, including 50 DC fast-charging points and 44 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Tesla Germany GmbH with 20 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites41
Charge points60
DC fast points50
150 kW and up44

Charge points by power

≤ 11 kW0
12–22 kW8
23–49 kW0
50–149 kW8
≥ 150 kW44

Operators

Tesla Germany GmbH20
Eviny14
IONITY GmbH10
Gemeindewerke Feucht Holding GmbH8
E.ON Drive Infrastructure4
E.ON Drive GmbH4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Wendelsteiner Str. 3, 90537 Feucht
    Eviny400 kW14 pointsCCS24/7
    Directions
  • Wendelsteiner Str. 5a, 90537 Feucht
    IONITY GmbH350 kW10 pointsCCS24/7
    Directions
  • Wendelsteiner Str. 3, 90537 Feucht
    Tesla Germany GmbH250 kW20 pointsCCS
    Directions
  • Raststätte Nürnberg Feucht Ost 0
    E.ON Drive Infrastructure50 kW2 pointsCCS
    Directions
  • Raststätte Nürnberg Feucht West 0
    E.ON Drive Infrastructure50 kW2 pointsCCS
    Directions
  • Nürnberg Feucht Ost 0
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Nürnberg Feucht West 0
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Bahndamm 0, 90537 Feucht
    Gemeindewerke Feucht Holding GmbH22 kW2 pointsType 2
    Directions
  • Bienenweg 0, 90537 Feucht
    Gemeindewerke Feucht Holding GmbH22 kW2 pointsType 2
    Directions
  • Ludwig-Ganghofer-Str. 0, 90537 Feucht
    Gemeindewerke Feucht Holding GmbH22 kW2 pointsType 2
    Directions
  • Kapellenplatz 5, 90537 Feucht
    Gemeindewerke Feucht Holding GmbH22 kW2 pointsType 224/7
    Directions

Recently opened

  • 24 Oct 2025 · Wendelsteiner Str. 5a · 350 kW · IONITY GmbH
  • 13 Aug 2025 · Wendelsteiner Str. 3 · 400 kW · Eviny
  • 8 Dec 2023 · Raststätte Nürnberg Feucht West 0 · 50 kW · E.ON Drive Infrastructure
  • 29 Nov 2023 · Raststätte Nürnberg Feucht Ost 0 · 50 kW · E.ON Drive Infrastructure
  • 30 Mar 2023 · Kapellenplatz 5 · 22 kW · Gemeindewerke Feucht Holding GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET