Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Schwarzwald-Baar-Kreis · Baden-Württemberg · Germany

EV charging stations in Furtwangen

13 public charging sites with 32 charge points are registered in Furtwangen, including 0 DC fast-charging points. The most powerful points deliver up to 22 kW.

The largest operator is B. Ketterer Söhne GmbH & Co. KG with 25 charge points; 4 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites13
Charge points32
DC fast points0
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW32
23–49 kW0
50–149 kW0
≥ 150 kW0

Operators

B. Ketterer Söhne GmbH & Co. KG25
EGT Energie GmbH4
EGT Energy Solutions GmbH2
EnergieWende Bregtal UG1

Charging sites

AC charge points, sorted by number of points.

  • Bahnhofstraße 20, 78120 Furtwangen
    B. Ketterer Söhne GmbH & Co. KG22 kW25 pointsType 2
    Directions
  • Gerwigstraße 1, 78120 Furtwangen
    EGT Energie GmbH22 kW2 pointsType 2
    Directions
  • Friedrichstrasse 3, 78120 Furtwangen
    EGT Energie GmbH22 kW2 pointsType 2
    Directions
  • Neuweg 11, 78120 Furtwangen
    EGT Energy Solutions GmbH22 kW2 pointsType 2
    Directions
  • Baumannstr. 13, 78120 Furtwangen
    EnergieWende Bregtal UG22 kW1 pointsType 2
    Directions

Recently opened

  • 19 Jan 2023 · Neuweg 11 · 22 kW · EGT Energy Solutions GmbH
  • 5 Aug 2022 · Bahnhofstraße 20 · 22 kW · B. Ketterer Söhne GmbH & Co. KG
  • 19 Jun 2020 · Baumannstr. 13 · 22 kW · EnergieWende Bregtal UG
  • 23 Apr 2018 · Friedrichstrasse 3 · 22 kW · EGT Energie GmbH
  • 19 Jul 2008 · Gerwigstraße 1 · 22 kW · EGT Energie GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET