EV charging stations in Ganderkesee
24 public charging sites with 41 charge points are registered in Ganderkesee, including 15 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is EWE Go GmbH with 20 charge points; 8 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rudolf-Diesel-Str. 2, 27777 GanderkeseeDirections
- Grüppenbührener Str. 6, 27777 GanderkeseeDirections
- Raststätte Hasbruch Nord 0, 27777 GanderkeseeDirections
- Raststätte Hasbruch Süd 0, 27777 GanderkeseeDirections
- Raiffeissenstr. 1, 27777 GanderkeseeDirections
- Stedinger Str. 6, 27777 GanderkeseeDirections
- Rastätte Hasbruch Nord 0, 27777 GanderkeseeDirections
- Rastätte Hasbruch Süd 0, 27777 GanderkeseeDirections
Other charging sites
AC charge points, sorted by number of points.
- Heideweg 2, 27777 GanderkeseeDirections
- Otto-Lilienthal-Str. 23 D, 27777 GanderkeseeDirections
- Grüner Weg 2, 27777 GanderkeseeDirections
- Bergedorfer Str. 4, 27777 GanderkeseeDirections
- Dorfring 40, 27777 GanderkeseeDirections
- Stedinger Str. 61, 27777 GanderkeseeDirections
- Ring 20, 27777 GanderkeseeDirections
- Stedinger Straße 59, 27777 GanderkeseeDirections
- Otto-Lilienthal-Str. 23 B, 27777 GanderkeseeDirections
- To'n Slagboom 4, 27777 GanderkeseeDirections
- Husumer Straße 17, 27777 GanderkeseeDirections
Recently opened
- 27 May 2026 · Grüppenbührener Str. 6 · 180 kW · Vattenfall Smarter Living GmbH
- 14 Oct 2025 · Heideweg 2 · 22 kW · EWE Go GmbH
- 26 Feb 2025 · Rudolf-Diesel-Str. 2 · 400 kW · EWE Go GmbH
- 30 Sept 2024 · To'n Slagboom 4 · 11 kW · Swen Joedecke
- 3 Aug 2023 · Otto-Lilienthal-Str. 23 D · 11 kW · Flugplatz Ganderkesee
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Wildeshausen 54
- Hatten 33
- Wardenburg 29
- Delmenhorst 156
- Stuhr 126
- Ritterhude 58
- Schwanewede 35
- Bremen 1,407
- Weyhe 46
- Osterholz-Scharmbeck 57
- Oldenburg 164
- Oldenburg (Oldb) 196
Data: official national charge point register (1 September 2026). Data sources