EV charging stations in Gescher

69 public charging sites with 140 charge points are registered in Gescher, including 14 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Cut! Energy GmbH with 56 charge points; 14 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites69
Charge points140
DC fast points14
150 kW and up12

Charge points by power

≤ 11 kW38
12–22 kW88
23–49 kW0
50–149 kW0
≥ 150 kW14

Operators

Cut! Energy GmbH56
Ladepark PlanET18
Huesker Synthetic GmbH16
Bischöfliche Stiftung Haus Hall16
Fastned Deutschland GmbH & Co. KG8
Herbstmann & Dempzin GbR8
SP Solar GmbH4
Westenergie Metering GmbH4
Dieker & Voss2
Pluq2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Büren 997, 48712 Gescher
    Fastned Deutschland GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Büren 998, 48712 Gescher
    Fastned Deutschland GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Porschestr. 2-4, 48712 Gescher
    Dieker & Voss300 kW2 pointsCCS24/7
    Directions
  • Wissingshof 4, 48712 Gescher
    SP Solar GmbH200 kW4 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Schildarpstr. 81, 48712 Gescher
    Cut! Energy GmbH22 kW40 pointsType 224/7
    Directions
  • Schildarpstr. 75, 48712 Gescher
    Ladepark PlanET22 kW18 pointsType 224/7
    Directions
  • Fabrikstr. 13-15, 48712 Gescher
    Huesker Synthetic GmbH11 kW16 pointsType 2
    Directions
  • Venneweg 47, 48712 Gescher
    Herbstmann & Dempzin GbR22 kW8 pointsType 2
    Directions
  • Haller Weg 77, 48712 Gescher
    Bischöfliche Stiftung Haus Hall11 kW6 pointsType 2
    Directions
  • Haller Weg 18, 48712 Gescher
    Bischöfliche Stiftung Haus Hall11 kW6 pointsType 2
    Directions
  • Inselstr. 5, 48712 Gescher
    Cut! Energy GmbH22 kW4 pointsType 224/7
    Directions
  • Tungerloh-Capellen 4g, 48712 Gescher
    Bischöfliche Stiftung Haus Hall11 kW4 pointsType 2
    Directions
  • Armlandstr. 3, 48712 Gescher
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Pappelallee 5, 48712 Gescher
    Cut! Energy GmbH22 kW2 pointsType 224/7
    Directions
  • Elionoe-Stein-Str. 6, 48712 Gescher
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Heinkelstr. 29, 48712 Gescher
    Cut! Energy GmbH22 kW2 pointsType 224/7
    Directions
  • Hauptstr. 39, 48712 Gescher
    Pluq22 kW2 pointsType 2
    Directions
  • Borkener Damm 73, 48712 Gescher
    Cut! Energy GmbH22 kW2 pointsType 224/7
    Directions
  • Fabrikstr. 13-15, 48712 Gescher
    Cut! Energy GmbH22 kW2 pointsType 224/7
    Directions
  • Auf dem Brink 79-81, 48712 Gescher
    Cut! Energy GmbH22 kW2 pointsType 224/7
    Directions
  • Bernhard-Wiesch-Straße 7, 48712 Gescher
    Mike Schulz22 kW2 pointsType 2
    Directions
  • Kardinal-von-Galen-Str. 2, 48712 Gescher
    Cut! Energy GmbH11 kW2 pointsType 224/7
    Directions
  • Schuckertstr. 16, 48712 Gescher
    Knoll GmbH & Co. KG11 kW2 pointsType 224/7
    Directions
  • Schuckertstraße 3, 48712 Gescher
    Elektro Wünsch GmbH11 kW1 pointsType 2
    Directions
  • Tungerloh-Pröbsting 56, 48712 Gescher
    Andrea Brüning11 kW1 pointsType 2
    Directions

Recently opened

  • 14 Apr 2026 · Wissingshof 4 · 200 kW · SP Solar GmbH
  • 22 Jan 2026 · Fabrikstr. 13-15 · 11 kW · Huesker Synthetic GmbH
  • 15 Jan 2026 · Haller Weg 18 · 11 kW · Bischöfliche Stiftung Haus Hall
  • 19 Dec 2025 · Büren 997 · 400 kW · Fastned Deutschland GmbH & Co. KG
  • 19 Dec 2025 · Büren 998 · 400 kW · Fastned Deutschland GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET