Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Zwickau · Sachsen · Germany

EV charging stations in Glauchau

28 public charging sites with 49 charge points are registered in Glauchau, including 13 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Überlandwerke Glauchau GmbH with 31 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites28
Charge points49
DC fast points13
150 kW and up10

Charge points by power

≤ 11 kW1
12–22 kW31
23–49 kW0
50–149 kW7
≥ 150 kW10

Operators

Überlandwerke Glauchau GmbH31
EnBW mobility+ AG und Co.KG8
Grüne Säule3
Circle K Deutschland2
LADEFIX2
Autohaus Bräutigam GmbH & Co. KG1
Thomas Kubbe1
Marlies Annemarie Flemming1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Waldenburger Str. 175, 08371 Glauchau
    EnBW mobility+ AG und Co.KG300 kW8 pointsCCS
    Directions
  • Waldenburger Straße 115, 08371 Glauchau
    Circle K Deutschland175 kW2 pointsCCS, CHAdeMO
    Directions
  • Sachsenallee 65, 08371 Glauchau
    Überlandwerke Glauchau GmbH76.5 kW5 pointsCCS, Type 2
    Directions
  • Rudolf-Breitscheid-Straße 10, 08371 Glauchau
    LADEFIX50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bahnhofstraße 7, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW4 pointsType 2
    Directions
  • Leipziger Str. 66-68, 08371 Glauchau
    Grüne Säule22 kW3 pointsType 2
    Directions
  • Bahnhofplatz 0, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Thurmer Straße 7, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Ringstr. 12, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 224/7
    Directions
  • Virchowstraße 18, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Wehrdigtstraße 29, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Hoffnung 29, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Leipziger Str. 34, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 224/7
    Directions
  • Lichtensteiner Str. 50, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 224/7
    Directions
  • Kopernikusstraße 51, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Lungwitzer Straße 55, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Hoffnung 83, 08371 Glauchau
    Überlandwerke Glauchau GmbH22 kW2 pointsType 2
    Directions
  • Körnerstr. 1, 08371 Glauchau
    Autohaus Bräutigam GmbH & Co. KG22 kW1 pointsType 224/7
    Directions
  • Egghalde 16, 08371 Glauchau
    Thomas Kubbe22 kW1 pointsType 224/7
    Directions
  • Albert-Köhler-Straße 47A, 08371 Glauchau
    Marlies Annemarie Flemming11 kW1 pointsType 2
    Directions

Recently opened

  • 14 Mar 2025 · Körnerstr. 1 · 22 kW · Autohaus Bräutigam GmbH & Co. KG
  • 10 Dec 2024 · Ringstr. 12 · 22 kW · Überlandwerke Glauchau GmbH
  • 10 Dec 2024 · Leipziger Str. 34 · 22 kW · Überlandwerke Glauchau GmbH
  • 10 Dec 2024 · Lichtensteiner Str. 50 · 22 kW · Überlandwerke Glauchau GmbH
  • 2 Apr 2024 · Bahnhofstraße 7 · 22 kW · Überlandwerke Glauchau GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET