EV charging stations in Glonn
18 public charging sites with 32 charge points are registered in Glonn, including 4 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Gut Sonnenhausen GmbH & Co KG with 16 charge points; 7 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Kastenseestr. 10, 85625 GlonnDirections
Other charging sites
AC charge points, sorted by number of points.
- Sonnenhausen 2, 85625 GlonnDirections
- Zinnebergerstr. 6, 85625 GlonnDirections
- Steinbruchweg 3, 85625 GlonnDirections
- Feldkirchener Str. 3, 85625 GlonnDirections
- Klosterweg 11, 85625 GlonnDirections
- Klosterweg 11, 85625 GlonnDirections
Recently opened
- 2 Jul 2026 · Feldkirchener Str. 3 · 22 kW · Hotel Café Schwaiger
- 11 Jun 2025 · Kastenseestr. 10 · 300 kW · EnBW mobility+ AG und Co.KG
- 31 Mar 2025 · Klosterweg 11 · 11 kW · Qwello Deutschland GmbH
- 27 Jun 2024 · Steinbruchweg 3 · 22 kW · Citywatt GmbH
- 25 Oct 2023 · Sonnenhausen 2 · 11 kW · Gut Sonnenhausen GmbH & Co KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Ebersberg 69
- Parsdorf 60
- Markt Schwaben 51
- Poing 43
Data: official national charge point register (1 September 2026). Data sources