EV charging stations in Halberstadt
54 public charging sites with 89 charge points are registered in Halberstadt, including 33 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Regioladen+ with 26 charge points; 15 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Quedlinburgerstr 101, 38820 HalberstadtDirections
- Gröperstr. 88, 38820 HalberstadtDirections
- Im Sülzeteiche 3, 38820 HalberstadtDirections
- Avenariusstr. 4, 38820 HalberstadtDirections
- Im Sülzeteiche 9, 38820 HalberstadtDirections
- Kühlinger Str. 12, 38820 HalberstadtDirections
- Breiter Weg 13, 38820 HalberstadtDirections
- Tschaikowskistr. 10, 38820 HalberstadtDirections
- Braunschweiger Str. 83-88, 38820 HalberstadtDirections
- Am Sülzegraben 2, 38820 HalberstadtDirections
- Magdeburger Str. 47, 38820 HalberstadtDirections
- Im Sülzeteiche 1, 38820 HalberstadtDirections
- In den langen Stücken 1, 38820 HalberstadtDirections
Other charging sites
AC charge points, sorted by number of points.
- Kühlinger Str. 39, 38820 HalberstadtDirections
- Kühlinger Str. 39, 38820 HalberstadtDirections
- Gebrüder-Rehse-Str. 12, 38820 HalberstadtDirections
- Am Sülzegraben 1, 38820 HalberstadtDirections
- Peterstreppe 0, 38820 HalberstadtDirections
- Martiniplan 0, 38820 HalberstadtDirections
- Peterstreppe 1, 38820 HalberstadtDirections
- Schuhstr. 1, 38820 HalberstadtDirections
- Bahnhofstr. 13, 38820 HalberstadtDirections
- Kühlinger Str. 26, 38820 HalberstadtDirections
- Voigtei 37, 38820 HalberstadtDirections
- Friedrich-Ebert-Str. 44, 38820 HalberstadtDirections
- Wehrstedter Str. 48, 38820 HalberstadtDirections
- Domplatz 49, 38820 HalberstadtDirections
- David-Oistrach-Straße 22, 38820 HalberstadtDirections
Recently opened
- 8 May 2026 · Kühlinger Str. 39 · 11 kW · E.ON Drive GmbH
- 9 Feb 2026 · Im Sülzeteiche 3 · 150 kW · Allego
- 8 Oct 2025 · Im Sülzeteiche 1 · 27 kW · Schubert Motors GmbH
- 3 Jul 2025 · Avenariusstr. 4 · 150 kW · Allego
- 13 May 2025 · Kühlinger Str. 39 · 11 kW · Servipark Deutschland GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Wernigerode 122
- Blankenburg (Harz) 54
- Quedlinburg 34
- Thale 31
Data: official national charge point register (1 September 2026). Data sources