Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Eichstätt · Bayern · Germany

EV charging stations in Hepberg

21 public charging sites with 30 charge points are registered in Hepberg, including 16 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is IONITY GmbH with 12 charge points; 3 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points30
DC fast points16
150 kW and up12

Charge points by power

≤ 11 kW0
12–22 kW10
23–49 kW0
50–149 kW8
≥ 150 kW12

Operators

IONITY GmbH12
Stefani Maschinenbau GmbH10
MER Germany8

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Köschinger Forst Ost 0, 85120 Hepberg
    IONITY GmbH350 kW6 pointsCCS
    Directions
  • Köschinger Forst West 0, 85120 Hepberg
    IONITY GmbH350 kW6 pointsCCS
    Directions
  • Köschinger Forst Ost 0, 85120 Hepberg
    MER Germany50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Köschinger Forst Ost 2 0, 85120 Hepberg
    MER Germany50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Köschinger Forst Ost 3 0, 85120 Hepberg
    MER Germany50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Köschinger Forst West,An der A9 0, 85120 Hepberg
    MER Germany50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • An der Batterie 2, 85120 Hepberg
    Stefani Maschinenbau GmbH22 kW10 pointsType 2
    Directions

Recently opened

  • 15 Mar 2023 · Köschinger Forst West,An der A9 0 · 50 kW · MER Germany
  • 30 Jan 2023 · An der Batterie 2 · 22 kW · Stefani Maschinenbau GmbH
  • 26 May 2021 · Köschinger Forst Ost 0 · 350 kW · IONITY GmbH
  • 26 May 2021 · Köschinger Forst West 0 · 350 kW · IONITY GmbH
  • 20 Dec 2017 · Köschinger Forst Ost 2 0 · 50 kW · MER Germany

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET