EV charging stations in Heusenstamm
27 public charging sites with 54 charge points are registered in Heusenstamm, including 8 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is MAINGAU Energie GmbH with 32 charge points; 6 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Werner-von-Siemens-Straße 2, 63150 HeusenstammDirections
Other charging sites
AC charge points, sorted by number of points.
- Seligenstädter Grund 14, 63150 HeusenstammDirections
- Ernst-Leitz-Str. 10, 63150 HeusenstammDirections
- Königsberger Straße 1, 63150 HeusenstammDirections
- Martinseestraße 1, 63150 HeusenstammDirections
- Jahnstraße 3, 63150 HeusenstammDirections
- Obertshäuser Straße 3, 63150 HeusenstammDirections
- Am Lindenbaum 4, 63150 HeusenstammDirections
- Lerchenstraße 4, 63150 HeusenstammDirections
- Karlsbader Straße 7, 63150 HeusenstammDirections
- Philipp-Reis-Straße 10, 63150 HeusenstammDirections
- Bahnhofsplatz 12, 63150 HeusenstammDirections
- Frankfurter Str. 16, 63150 HeusenstammDirections
- Neuer Weg 21, 63150 HeusenstammDirections
- Kantstr. 21, 63150 HeusenstammDirections
- Max-Planck-Straße 24, 63150 HeusenstammDirections
- Hainerweg 25, 63150 HeusenstammDirections
- Leibnizstraße 51, 63150 HeusenstammDirections
- Jahnstraße 64, 63150 HeusenstammDirections
- Hainhäuser Straße 999Z, 63150 HeusenstammDirections
- Frankfurter Straße 20, 63150 HeusenstammDirections
Recently opened
- 30 Jun 2025 · Frankfurter Str. 16 · 22 kW · MAINGAU Energie GmbH
- 30 Jun 2025 · Kantstr. 21 · 22 kW · MAINGAU Energie GmbH
- 18 Oct 2024 · Seligenstädter Grund 14 · 22 kW · Danieal Seitz
- 23 Sept 2024 · Philipp-Reis-Straße 10 · 22 kW · Wirelane GmbH
- 30 Apr 2024 · Karlsbader Straße 7 · 22 kW · MAINGAU Energie GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Rodgau 88
- Neu-Isenburg 83
- Seligenstadt 62
- Langen 60
- Dreieich 59
- Dietzenbach 53
- Obertshausen 43
- Egelsbach 34
- Rödermark 34
- Mainhausen 30
- Hainburg 25
Data: official national charge point register (1 September 2026). Data sources