Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Höxter · Nordrhein-Westfalen · Germany

EV charging stations in Höxter

41 public charging sites with 85 charge points are registered in Höxter, including 25 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Westfalen Weser Ladeservice GmbH with 36 charge points; 14 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites41
Charge points85
DC fast points25
150 kW and up4

Charge points by power

≤ 11 kW5
12–22 kW32
23–49 kW0
50–149 kW44
≥ 150 kW4

Operators

Westfalen Weser Ladeservice GmbH36
Stadt Höxter10
Lidl6
WELLER6
Aral Pulse4
Weser-Wohnwelt Möbel-Fischer GmbH & Co. KG4
Eureka Holding Germany GmbH4
Seibert GmbH & Co. KG4
ALDI Nord2
Westenergie Metering GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Albaxer Straße 65, 37671 Höxter
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Lütmarser Str. 76, 37671 Höxter
    Lidl60 kW6 pointsCCS, Type 2
    Directions
  • Zur Lüre 54, 37671 Höxter
    Westfalen Weser Ladeservice GmbH50 kW10 pointsCCS, Type 2
    Directions
  • Holzmindener Str. 30, 37671 Höxter
    WELLER50 kW6 pointsCCS, Type 2
    Directions
  • Im Brückfeld 0, 37671 Höxter
    Stadt Höxter50 kW4 pointsCCS, Type 2
    Directions
  • Im Brückfeld 4, 37671 Höxter
    Westfalen Weser Ladeservice GmbH50 kW4 pointsCCS, Type 2
    Directions
  • Bahnhofstraße 0, 37671 Höxter
    Stadt Höxter50 kW2 pointsCCS, Type 2
    Directions
  • Uferstraße 0, 37671 Höxter
    Stadt Höxter50 kW2 pointsCCS, Type 2
    Directions
  • Albaxer Straße 0, 37671 Höxter
    Stadt Höxter50 kW2 pointsCCS, Type 2
    Directions
  • Küsterweg 1, 37671 Höxter
    ALDI Nord50 kW2 pointsCCS24/7
    Directions
  • Bahnhofstraße 6, 37671 Höxter
    Westfalen Weser Ladeservice GmbH50 kW2 pointsCCS, Type 2
    Directions
  • Uferstr. 6, 37671 Höxter
    Westfalen Weser Ladeservice GmbH50 kW2 pointsCCS, Type 2
    Directions
  • Albaxer Str. 1a, 37671 Höxter
    Westfalen Weser Ladeservice GmbH50 kW2 pointsCCS, Type 2
    Directions
  • Albaxer Str. 60, 37671 Höxter
    Seibert GmbH & Co. KG22 kW4 pointsCCS, Type 2
    Directions
  • Zur Lüre 55, 37671 Höxter
    Hermann GmbH22 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Brenkhäuser Str. 71, 37671 Höxter
    Westfalen Weser Ladeservice GmbH22 kW6 pointsType 2
    Directions
  • Albaxer Straße 67, 37671 Höxter
    Weser-Wohnwelt Möbel-Fischer GmbH & Co. KG22 kW4 pointsType 2
    Directions
  • Möllingerstr. 1, 37671 Höxter
    Westfalen Weser Ladeservice GmbH22 kW4 pointsType 224/7
    Directions
  • Konrad-Zuse-Str. 1, 37671 Höxter
    Eureka Holding Germany GmbH22 kW4 pointsType 224/7
    Directions
  • Höxtersche Str. 3
    Westfalen Weser Ladeservice GmbH11 kW4 pointsType 2
    Directions
  • Moltkestr. 12, 37671 Höxter
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Corveyer Allee 21, 37671 Höxter
    Westfalen Weser Ladeservice GmbH22 kW2 pointsType 2
    Directions
  • Corveyer Allee 21, 37671 Höxter
    Gas- und Wasserversorgung Höxter GmbH22 kW2 pointsType 2
    Directions
  • Grüne Mühle 90, 37671 Höxter
    Asklepios Weserbergland Klinik GmbH22 kW2 pointsType 2
    Directions
  • Sudbury Straße 13a, 37671 Höxter
    Frank Wiesemann11 kW1 pointsType 2
    Directions

Recently opened

  • 26 Aug 2026 · Holzmindener Str. 30 · 50 kW · WELLER
  • 1 Jan 2026 · Zur Lüre 55 · 22 kW · Hermann GmbH
  • 2 Sept 2025 · Konrad-Zuse-Str. 1 · 22 kW · Eureka Holding Germany GmbH
  • 9 Apr 2025 · Küsterweg 1 · 50 kW · ALDI Nord
  • 20 Aug 2024 · Möllingerstr. 1 · 22 kW · Westfalen Weser Ladeservice GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET