EV charging stations in Königs Wusterhausen
23 public charging sites with 33 charge points are registered in Königs Wusterhausen, including 22 DC fast-charging points and 19 delivering at least 150 kW. The most powerful points deliver up to 1,000 kW.
The largest operator is Aral Pulse with 11 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Robert-Guthmann-Str. 1, 15713 Königs WusterhausenDirections
- Robert-Guthmann-Straße 1, 15713 Königs WusterhausenDirections
- Darwinbogen 4, 15711 Königs WusterhausenDirections
- Cottbuser Str. 29A, 15711 Königs WusterhausenDirections
- Karl-Liebknecht-Str. 58, 15711 Königs WusterhausenDirections
- Karl-Liebknecht-Straße 179, 15711 Königs WusterhausenDirections
- Wiesenstr. 7, 15711 Königs WusterhausenDirections
Other charging sites
AC charge points, sorted by number of points.
- Heinrich-Heine-Str. 38a, 15711 Königs WusterhausenDirections
- Heinrich-Heine-Str. 58, 15711 Königs WusterhausenDirections
- Mozartstraße 7, 15711 Königs WusterhausenDirections
- Potsdamer Str. 79, 15711 Königs WusterhausenDirections
- Am Möllenberg 39, 15713 Königs WusterhausenDirections
- Niederlehmer Chaussee 8 c, 15713 Königs WusterhausenDirections
- Am Weinberg 10, 15711 Königs WusterhausenDirections
- Mozartstraße 15, 15711 Königs WusterhausenDirections
Recently opened
- 5 Jun 2026 · Robert-Guthmann-Str. 1 · 1,000 kW · Aral Pulse
- 3 Jun 2025 · Karl-Liebknecht-Str. 58 · 150 kW · Q1 Autostrom
- 31 Oct 2024 · Potsdamer Str. 79 · 22 kW · ZaYa Energie GmbH
- 16 Oct 2024 · Darwinbogen 4 · 180 kW · Vattenfall Smarter Living GmbH
- 1 Aug 2024 · Heinrich-Heine-Str. 58 · 11 kW · Therapiezentrum M. Thierbach
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Schönefeld 146
- Wildau 68
- Luckau 38
- Lübben (Spreewald) 33
Data: official national charge point register (1 September 2026). Data sources