Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Rhein-Neckar-Kreis · Baden-Württemberg · Germany

EV charging stations in Leimen

14 public charging sites with 29 charge points are registered in Leimen, including 12 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 9 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites14
Charge points29
DC fast points12
150 kW and up12

Charge points by power

≤ 11 kW6
12–22 kW10
23–49 kW0
50–149 kW0
≥ 150 kW13

Operators

EnBW mobility+ AG und Co.KG9
Stadt Leimen6
Wirelane GmbH6
JET Tankstellen Deutschland GmbH4
go2zero4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Im Hagen 2, 69181 Leimen
    JET Tankstellen Deutschland GmbH400 kW4 pointsCCS
    Directions
  • Gottlieb-Daimler-Str. 1, 69181 Leimen
    EnBW mobility+ AG und Co.KG150 kW9 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hamburger Straße 4, 69181 Leimen
    Wirelane GmbH11 kW6 pointsType 2
    Directions
  • Jahnstraße 4, 69181 Leimen
    go2zero22 kW4 pointsType 2
    Directions
  • Weberstr. 2, 69181 Leimen
    Stadt Leimen22 kW2 pointsType 224/7
    Directions
  • Turmgasse 20, 69181 Leimen
    Stadt Leimen22 kW2 pointsType 224/7
    Directions
  • Hauptstr. 36, 69181 Leimen
    Stadt Leimen22 kW2 pointsType 224/7
    Directions

Recently opened

  • 8 May 2025 · Hamburger Straße 4 · 11 kW · Wirelane GmbH
  • 20 Jun 2024 · Hauptstr. 36 · 22 kW · Stadt Leimen
  • 28 May 2024 · Im Hagen 2 · 400 kW · JET Tankstellen Deutschland GmbH
  • 3 Apr 2024 · Jahnstraße 4 · 22 kW · go2zero
  • 5 Feb 2021 · Gottlieb-Daimler-Str. 1 · 150 kW · EnBW mobility+ AG und Co.KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET