EV charging stations in Lindau (Bodensee)
50 public charging sites with 86 charge points are registered in Lindau (Bodensee), including 41 DC fast-charging points and 30 delivering at least 150 kW. The most powerful points deliver up to 250 kW.
The largest operator is SW Lindau with 28 charge points; 12 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Josephine-Hirner-Str. 6, 88131 Lindau (Bodensee)Directions
- Peter-Dornier-Str. 2, 88131 Lindau (Bodensee)Directions
- Von-Behring-Str. 4, 88131 Lindau (Bodensee)Directions
- Josephine-Hirner-Str. 3, 88131 Lindau (Bodensee)Directions
- Robert-Bosch-Str. 38, 88131 Lindau (Bodensee)Directions
- Kemptener Str. 114, 88131 Lindau (Bodensee)Directions
- Webergasse 1, 88131 Lindau (Bodensee)Directions
- Kemptener Str. 17, 88131 Lindau (Bodensee)Directions
- Heuriedweg 21, 88131 Lindau (Bodensee)Directions
- Riggersweilerweg 5, 88131 Lindau (Bodensee)Directions
- Bregenzer Str. 54, 88131 Lindau (Bodensee)Directions
Other charging sites
AC charge points, sorted by number of points.
- Karl-Bever-Platz 0, 88131 Lindau (Bodensee)Directions
- Peter-Dornier-Str. 11, 88131 Lindau (Bodensee)Directions
- Peter-Dornier-Str. 11, 88131 Lindau (Bodensee)Directions
- Heuriedweg 34-36, 88131 Lindau (Bodensee)Directions
- Zwanzigerstr. 8, 88131 Lindau (Bodensee)Directions
- Bleicheweg 13, 88131 Lindau (Bodensee)Directions
- Von-Behring-Str. 1, 88131 Lindau (Bodensee)Directions
- Bregenzer Str. 12, 88131 Lindau (Bodensee)Directions
- Friedrichshafener Str. 80a, 88131 Lindau (Bodensee)Directions
Recently opened
- 19 Dec 2025 · Bregenzer Str. 54 · 22 kW · SW Lindau
- 7 Mar 2025 · Josephine-Hirner-Str. 3 · 150 kW · SW Lindau
- 1 Jan 2025 · Riggersweilerweg 5 · 25 kW · Walter Seitz GmbH + Co. KG
- 27 Nov 2024 · Peter-Dornier-Str. 11 · 22 kW · Jöchle Mobility GmbH
- 2 Oct 2024 · Bleicheweg 13 · 22 kW · SW Lindau
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Scheidegg 27
- Kressbronn 28
- Wangen 30
- Tettnang 25
- Wangen im Allgäu 57
- Meckenbeuren 46
- Friedrichshafen 178
- Oberstaufen 49
- Kißlegg 50
- Ravensburg 335
- Weingarten 37
- Isny im Allgäu 41
Data: official national charge point register (1 September 2026). Data sources