EV charging stations in Lollar
11 public charging sites with 27 charge points are registered in Lollar, including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Robert Bosch GmbH with 14 charge points; 4 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rothweg 3, 35457 LollarDirections
- Rothweg 4, 35457 LollarDirections
- Am Alten Bahnhof 10, 35457 LollarDirections
Other charging sites
AC charge points, sorted by number of points.
- Justus-Kilian-Straße 1, 35457 LollarDirections
- Holzmühler Weg 76, 35457 LollarDirections
Recently opened
- 24 May 2026 · Justus-Kilian-Straße 1 · 22 kW · Robert Bosch GmbH
- 25 Mar 2026 · Am Alten Bahnhof 10 · 50 kW · TEAG Mobil GmbH
- 21 May 2025 · Rothweg 3 · 300 kW · EAM Natur Energie GmbH
- 5 Oct 2023 · Rothweg 4 · 225 kW · EAM Natur Energie GmbH
- 25 Feb 2022 · Holzmühler Weg 76 · 22 kW · E.ON Drive GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Gießen 328
- Grünberg 39
- Reiskirchen 38
- Linden 34
- Pohlheim 25
Data: official national charge point register (1 September 2026). Data sources