EV charging stations in Malsfeld
24 public charging sites with 40 charge points are registered in Malsfeld, including 26 DC fast-charging points and 24 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is EnBW mobility+ AG und Co.KG with 16 charge points; 6 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Dr.-Reimer-Straße 1, 34323 MalsfeldDirections
- Dr.-Reimer-Straße 2, 34323 MalsfeldDirections
- Dr.-Reimer-Straße 2, 34323 MalsfeldDirections
- Am Knick 2, 34323 MalsfeldDirections
Other charging sites
AC charge points, sorted by number of points.
- Zum Steeger 3, 34323 MalsfeldDirections
- Industriestr. 7, 34323 MalsfeldDirections
Recently opened
- 15 Jul 2026 · Dr.-Reimer-Straße 1 · 400 kW · EnBW mobility+ AG und Co.KG
- 10 Dec 2025 · Am Knick 2 · 49 kW · EAM Natur Energie GmbH
- 1 Dec 2025 · Industriestr. 7 · 22 kW · TEAG Mobil GmbH
- 20 Mar 2023 · Dr.-Reimer-Straße 2 · 250 kW · Tesla Germany GmbH
- 31 Mar 2022 · Zum Steeger 3 · 11 kW · Dr. Schumacher GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Fritzlar 61
- Melsungen 47
- Guxhagen 45
- Knüllwald 45
- Schwalmstadt 30
Data: official national charge point register (1 September 2026). Data sources