EV charging stations in Mayen
29 public charging sites with 57 charge points are registered in Mayen, including 30 DC fast-charging points and 24 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Citywatt GmbH with 10 charge points; 14 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Polcher Str. 166, 56727 MayenDirections
- Koblenzer Str. 160, 56727 MayenDirections
- Koblenzer Strasse 152-154, 56727 MayenDirections
- Am Wasserturm 19, 56727 MayenDirections
- Kelberger Straße 68, 56727 MayenDirections
- Polcher Str. 87, 56727 MayenDirections
- Polcher Str. 81, 56727 MayenDirections
- Koblenzer Str. 174A, 56727 MayenDirections
- Kelberger Strasse 83, 56727 MayenDirections
Other charging sites
AC charge points, sorted by number of points.
- St.-Veit-Straße 6, 56727 MayenDirections
- Virchowstr. 0, 56727 MayenDirections
- Rosengasse 2, 56727 MayenDirections
- Im Trinnel 23, 56727 MayenDirections
- Habsburgring 99, 56727 MayenDirections
- Polcher Str. 164, 56727 MayenDirections
- Hauptstraße 30z, 56727 MayenDirections
- Am Bürgerhaus 0, 56727 MayenDirections
- Katzenberger Weg 9, 56727 MayenDirections
- Mayener Straße 28Directions
- Hauptstr. 86, 56727 MayenDirections
- Am Wasserturm 7, 56727 MayenDirections
- Bannerberg 28, 56727 MayenDirections
Recently opened
- 4 Aug 2026 · Hauptstr. 86 · 22 kW · Christiane und Hubertus Müller GbR
- 27 Nov 2025 · Am Wasserturm 19 · 200 kW · EnBW mobility+ AG und Co.KG
- 4 Aug 2025 · Polcher Str. 87 · 60 kW · Lidl
- 1 Jul 2025 · Koblenzer Str. 160 · 300 kW · EWE Go GmbH
- 22 Jan 2025 · Polcher Str. 81 · 50 kW · ALDI SÜD
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Andernach 62
- Polch 49
- Mülheim-Kärlich 37
- Baar 32
Data: official national charge point register (1 September 2026). Data sources