Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Rheingau-Taunus-Kreis · Hessen · Germany

EV charging stations in Niedernhausen

18 public charging sites with 32 charge points are registered in Niedernhausen, including 26 DC fast-charging points and 24 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is IONITY GmbH with 16 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points32
DC fast points26
150 kW and up24

Charge points by power

≤ 11 kW1
12–22 kW4
23–49 kW0
50–149 kW3
≥ 150 kW24

Operators

IONITY GmbH16
EWE Go GmbH6
Mainova AG4
Lidl3
ALDI SÜD2
Stefanie und Hauke Deckarm GbR1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Frankfurter Str. 1, 65527 Niedernhausen
    IONITY GmbH350 kW16 pointsCCS24/7
    Directions
  • Frankfurter Str. 3, 65527 Niedernhausen
    EWE Go GmbH200 kW6 pointsCCS24/7
    Directions
  • Idsteiner Str. 19-23, 65527 Niedernhausen
    Mainova AG150 kW2 pointsCCS24/7
    Directions
  • Platter Str. 11, 65527 Niedernhausen
    Lidl60 kW3 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Zum Hammergrund 1, 65527 Niedernhausen
    Mainova AG22 kW2 pointsType 2
    Directions
  • Frankfurter Straße 11-13, 65527 Niedernhausen
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Pirolweg 1, 65527 Niedernhausen
    Stefanie und Hauke Deckarm GbR11 kW1 pointsType 2
    Directions

Recently opened

  • 17 Apr 2026 · Frankfurter Str. 1 · 350 kW · IONITY GmbH
  • 4 Dec 2024 · Frankfurter Str. 3 · 200 kW · EWE Go GmbH
  • 27 Aug 2024 · Idsteiner Str. 19-23 · 150 kW · Mainova AG
  • 20 Sept 2022 · Platter Str. 11 · 60 kW · Lidl
  • 15 Dec 2021 · Frankfurter Straße 11-13 · 22 kW · ALDI SÜD

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET