Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Rottweil · Baden-Württemberg · Germany

EV charging stations in Oberndorf am Neckar

14 public charging sites with 28 charge points are registered in Oberndorf am Neckar, including 9 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is HEIS GmbH with 18 charge points; 4 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites14
Charge points28
DC fast points9
150 kW and up4

Charge points by power

≤ 11 kW18
12–22 kW2
23–49 kW0
50–149 kW4
≥ 150 kW4

Operators

HEIS GmbH18
EnBW mobility+ AG und Co.KG6
ALDI SÜD2
Autohaus Grossmann GmbH & Co. KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Im Vogelloch 15, 78727 Oberndorf am Neckar
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Sägewerkstraße 6, 78727 Oberndorf am Neckar
    EnBW mobility+ AG und Co.KG100 kW2 pointsCCS24/7
    Directions
  • An der Hochbrücke 2, 78727 Oberndorf am Neckar
    ALDI SÜD50 kW2 pointsCCS
    Directions
  • Austraße 51, 78727 Oberndorf am Neckar
    Autohaus Grossmann GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Steinbeisstr. 4/4, 78727 Oberndorf am Neckar
    HEIS GmbH11 kW8 pointsType 2
    Directions
  • Steinbeisstr. 4/5, 78727 Oberndorf am Neckar
    HEIS GmbH11 kW8 pointsType 2
    Directions
  • Franz-Xaver-Singer Str. 2, 78727 Oberndorf am Neckar
    HEIS GmbH11 kW2 pointsType 2
    Directions

Recently opened

  • 14 Apr 2026 · Steinbeisstr. 4/4 · 11 kW · HEIS GmbH
  • 14 Apr 2026 · Steinbeisstr. 4/5 · 11 kW · HEIS GmbH
  • 14 Apr 2026 · Franz-Xaver-Singer Str. 2 · 11 kW · HEIS GmbH
  • 17 Mar 2026 · Sägewerkstraße 6 · 100 kW · EnBW mobility+ AG und Co.KG
  • 6 Jun 2024 · An der Hochbrücke 2 · 50 kW · ALDI SÜD

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET