Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Osnabrück · Niedersachsen · Germany

EV charging stations in Ostercappeln

21 public charging sites with 40 charge points are registered in Ostercappeln, including 4 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is Gemeinde Ostercappeln with 12 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points40
DC fast points4
150 kW and up2

Charge points by power

≤ 11 kW7
12–22 kW28
23–49 kW0
50–149 kW2
≥ 150 kW3

Operators

Gemeinde Ostercappeln12
Westenergie Metering GmbH10
OPG mbH6
Wirelane GmbH4
EDEKA-MIHA Charge GmbH3
go2zero2
Patrick Kröger1
Markus Linkemeyer1
Tobias Büscherhoff1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bremer Str. 1, 49179 Ostercappeln
    EDEKA-MIHA Charge GmbH150 kW3 pointsCCS, Type 224/7
    Directions
  • Gartenstr. 12, 49179 Ostercappeln
    OPG mbH50 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bremer Straße 31, 49179 Ostercappeln
    Gemeinde Ostercappeln22 kW8 pointsType 2
    Directions
  • Bremerstr. 0, 49179 Ostercappeln
    Westenergie Metering GmbH22 kW4 pointsType 2
    Directions
  • Gildebrede 1, 49179 Ostercappeln
    Gemeinde Ostercappeln22 kW4 pointsType 2
    Directions
  • Zum Kronensee 11, 49179 Ostercappeln
    OPG mbH11 kW4 pointsType 224/7
    Directions
  • Markt 3, 49179 Ostercappeln
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Im Schlingerort 5, 49179 Ostercappeln
    go2zero22 kW2 pointsType 224/7
    Directions
  • Hauptstr. 14, 49179 Ostercappeln
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Mühlenstraße 14, 49179 Ostercappeln
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Am Sportplatz 18, 49179 Ostercappeln
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Gartenstr. 14z, 49179 Ostercappeln
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Heinrich-Witte-Straße 12, 49179 Ostercappeln
    Patrick Kröger11 kW1 pointsType 2
    Directions
  • Im Haferkamp 24, 49179 Ostercappeln
    Markus Linkemeyer11 kW1 pointsType 2
    Directions
  • Schlingheide 2a, 49179 Ostercappeln
    Tobias Büscherhoff11 kW1 pointsType 2
    Directions

Recently opened

  • 15 Jul 2026 · Zum Kronensee 11 · 11 kW · OPG mbH
  • 3 Nov 2025 · Gartenstr. 12 · 50 kW · OPG mbH
  • 21 Oct 2025 · Bremer Str. 1 · 150 kW · EDEKA-MIHA Charge GmbH
  • 19 Sept 2025 · Markt 3 · 22 kW · Wirelane GmbH
  • 19 Sept 2025 · Am Sportplatz 18 · 22 kW · Wirelane GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET