Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Verden · Niedersachsen · Germany

EV charging stations in Ottersberg

35 public charging sites with 58 charge points are registered in Ottersberg, including 46 DC fast-charging points and 46 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 20 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites35
Charge points58
DC fast points46
150 kW and up46

Charge points by power

≤ 11 kW0
12–22 kW10
23–49 kW0
50–149 kW0
≥ 150 kW48

Operators

EnBW mobility+ AG und Co.KG20
Tesla Germany GmbH12
Allego8
EWE Go GmbH8
Merdedes-Benz High Power Charging Network6
Elektrizitäts-Werk Ottersberg4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Posthausen 1, 28870 Ottersberg
    EnBW mobility+ AG und Co.KG400 kW20 pointsCCS
    Directions
  • Posthausen 1, 28870 Ottersberg
    Allego300 kW8 pointsCCS, Type 2
    Directions
  • Posthausen 1, 28870 Ottersberg
    Tesla Germany GmbH250 kW12 pointsCCS
    Directions
  • Posthausen 1, 28870 Ottersberg
    Merdedes-Benz High Power Charging Network200 kW6 pointsCCS24/7
    Directions
  • Posthausen 11, 28870 Ottersberg
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Posthausen 1, 28870 Ottersberg
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Landstr. 22, 28870 Ottersberg
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Landstraße 22, 28870 Ottersberg
    Elektrizitäts-Werk Ottersberg22 kW2 pointsType 2
    Directions
  • Grüne Str. 24, 28870 Ottersberg
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Grüne Straße 24, 28870 Ottersberg
    Elektrizitäts-Werk Ottersberg22 kW2 pointsType 2
    Directions

Recently opened

  • 7 Aug 2025 · Posthausen 1 · 200 kW · Merdedes-Benz High Power Charging Network
  • 20 Dec 2023 · Posthausen 1 · 400 kW · EnBW mobility+ AG und Co.KG
  • 5 May 2023 · Posthausen 1 · 300 kW · Allego
  • 16 Jun 2022 · Posthausen 1 · 250 kW · Tesla Germany GmbH
  • 25 May 2020 · Posthausen 11 · 150 kW · EWE Go GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out