Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Region Hannover · Niedersachsen · Germany

EV charging stations in Pattensen

17 public charging sites with 39 charge points are registered in Pattensen, including 6 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is enercity AG with 18 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites17
Charge points39
DC fast points6
150 kW and up2

Charge points by power

≤ 11 kW4
12–22 kW28
23–49 kW0
50–149 kW5
≥ 150 kW2

Operators

enercity AG18
Avacon AG6
Leine Hotel GmbH4
EVI Energieversorgung Hildesheim GmbH & Co. KG4
Lidl3
EWE Go GmbH2
E.ON Drive GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Auf der Burg 6, 30982 Pattensen
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions
  • Göttinger Str. 11-13, 30982 Pattensen
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Rathausplatz 1, 30982 Pattensen
    enercity AG50 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Schöneberger Str. 43, 30982 Pattensen
    Leine Hotel GmbH22 kW4 pointsType 2
    Directions
  • Marienstraße 11, 30982 Pattensen
    EVI Energieversorgung Hildesheim GmbH & Co. KG11 kW4 pointsType 2
    Directions
  • Am Hallenbad 0, 21365 Pattensen
    Avacon AG22 kW2 pointsType 2
    Directions
  • Heinz-Golitz-Str. 0, 27318 Pattensen
    Avacon AG22 kW2 pointsType 2
    Directions
  • Am Hallenbad 0, 30982 Pattensen
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Bruchweg 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Oerier Str. 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Jahnstr. 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Osterfeld 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Deisterplatz 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Landstr. 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Rethener Str. 0, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Hauptstr. 2, 30982 Pattensen
    enercity AG22 kW2 pointsType 224/7
    Directions
  • Teichstr. 11, 30982 Pattensen
    Avacon AG22 kW2 pointsType 2
    Directions

Recently opened

  • 8 May 2026 · Hauptstr. 2 · 22 kW · enercity AG
  • 23 Apr 2026 · Rathausplatz 1 · 50 kW · enercity AG
  • 25 Sept 2025 · Jahnstr. 0 · 22 kW · enercity AG
  • 25 Sept 2025 · Landstr. 0 · 22 kW · enercity AG
  • 25 Sept 2025 · Rethener Str. 0 · 22 kW · enercity AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET