EV charging stations in Pegau

16 public charging sites with 34 charge points are registered in Pegau, including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Zeitz GmbH with 10 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points34
DC fast points10
150 kW and up8

Charge points by power

≤ 11 kW6
12–22 kW18
23–49 kW0
50–149 kW2
≥ 150 kW8

Operators

Stadtwerke Zeitz GmbH10
EG Heimann/ Heimann GbR6
Shell Deutschland GmbH4
EWE Go GmbH4
Neukauf Verbrauchermarkt GmbH2
Lidl2
Stadtwerke Leipzig GmbH2
envia Mitteldeutsche Energie AG2
AMB Automobile Borna GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Leipziger Vorstadt 22, 04523 Pegau
    Shell Deutschland GmbH300 kW4 pointsCCS
    Directions
  • Audigaster Str. 1, 04523 Pegau
    EWE Go GmbH150 kW4 pointsCCS24/7
    Directions
  • Audigaster Str. 1, 04523 Pegau
    Neukauf Verbrauchermarkt GmbH50 kW2 pointsCCS, Type 224/7
    Directions
  • Leipziger Vorstadt 24, 04523 Pegau
    AMB Automobile Borna GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Wachenheimer Str. 1, 04523 Pegau
    Stadtwerke Zeitz GmbH22 kW10 pointsType 224/7
    Directions
  • Zeitzer Str. 10, 04523 Pegau
    EG Heimann/ Heimann GbR11 kW6 pointsType 2
    Directions
  • Groitzscher Fußweg 1, 04523 Pegau
    Lidl22 kW2 pointsType 2
    Directions
  • Asternweg 3, 04523 Pegau
    Stadtwerke Leipzig GmbH22 kW2 pointsType 224/7
    Directions
  • Kirchplatz 8, 04523 Pegau
    envia Mitteldeutsche Energie AG22 kW2 pointsType 224/7
    Directions

Recently opened

  • 23 Apr 2025 · Asternweg 3 · 22 kW · Stadtwerke Leipzig GmbH
  • 4 Apr 2025 · Wachenheimer Str. 1 · 22 kW · Stadtwerke Zeitz GmbH
  • 18 Nov 2024 · Audigaster Str. 1 · 150 kW · EWE Go GmbH
  • 13 Sept 2024 · Audigaster Str. 1 · 50 kW · Neukauf Verbrauchermarkt GmbH
  • 27 Sept 2023 · Leipziger Vorstadt 22 · 300 kW · Shell Deutschland GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET