EV charging stations in Rösrath
24 public charging sites with 41 charge points are registered in Rösrath, including 18 DC fast-charging points and 11 delivering at least 150 kW. The most powerful points deliver up to 320 kW.
The largest operator is StadtWerke Rösrath - Energie GmbH with 16 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Otto-Brenner-Straße 2, 51503 RösrathDirections
- Königsforst Ost BAB 3 BAB 3, 51503 RösrathDirections
- Oswald- von- Nell- Breuning- Straße 4, 51503 RösrathDirections
- Raststätte Königsforst West 0, 51503 RösrathDirections
- Bitze 6, 51503 RösrathDirections
- Raststätte Königsforst Ost, A3 0, 51503 RösrathDirections
- Hauptstr. 102, 51503 RösrathDirections
- Kölner Str. 47, 51503 RösrathDirections
Other charging sites
AC charge points, sorted by number of points.
- Adolph-Kolping-Straße 4, 51503 RösrathDirections
- Bahnhofstraße 2, 51503 RösrathDirections
- Leibnizpark 4, 51503 RösrathDirections
- Hauptstraße 75, 51503 RösrathDirections
- Hauptstraße 142, 51503 RösrathDirections
- Bensberger Straße 262, 51503 RösrathDirections
- Hauptstraße 260, 51503 RösrathDirections
- Pestalozziweg 19, 51503 RösrathDirections
- Leibnizpark 9, 51503 RösrathDirections
- Am Herdchen 18, 51503 RösrathDirections
Recently opened
- 26 Feb 2026 · Leibnizpark 4 · 22 kW · StadtWerke Rösrath - Energie GmbH
- 18 Aug 2025 · Raststätte Königsforst West 0 · 150 kW · E.ON Drive Infrastructure
- 18 Jul 2025 · Raststätte Königsforst Ost, A3 0 · 100 kW · E.ON Drive Infrastructure
- 27 Jun 2025 · Hauptstr. 102 · 50 kW · EDEKA Breidohr's
- 8 Jan 2025 · Bitze 6 · 150 kW · StadtWerke Rösrath - Energie GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bergisch Gladbach 267
- Wermelskirchen 48
- Overath 44
- Burscheid 32
Data: official national charge point register (1 September 2026). Data sources