Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Wetteraukreis · Hessen · Germany

EV charging stations in Rosbach

18 public charging sites with 28 charge points are registered in Rosbach, including 12 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is Mainova AG with 10 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points28
DC fast points12
150 kW and up12

Charge points by power

≤ 11 kW0
12–22 kW14
23–49 kW0
50–149 kW0
≥ 150 kW14

Operators

Mainova AG10
IONITY GmbH6
Pfalzwerke AG6
Shell Deutschland GmbH2
Step Inn Hotel2
Oberhessische Versorgungsbetriebe AG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Carl-Benz-Str. 16, 61191 Rosbach
    IONITY GmbH350 kW6 pointsCCS24/7
    Directions
  • Dieselstraße 3, 61191 Rosbach
    Pfalzwerke AG300 kW6 pointsCCS, Type 2
    Directions
  • Raiffeisenstraße 2, 61191 Rosbach
    Shell Deutschland GmbH175 kW2 pointsCCS, CHAdeMO
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Grabengasse 12, 61191 Rosbach
    Mainova AG22 kW4 pointsType 2
    Directions
  • An den Junkergärten 1, 61191 Rosbach
    Mainova AG22 kW2 pointsType 2
    Directions
  • Steigerweg 3, 61191 Rosbach
    Mainova AG22 kW2 pointsType 2
    Directions
  • Hessenring 5, 61191 Rosbach
    Mainova AG22 kW2 pointsType 2
    Directions
  • Raiffeisenstr. 20, 61191 Rosbach
    Step Inn Hotel22 kW2 pointsType 2
    Directions
  • Homburger Straße 64, 61191 Rosbach
    Oberhessische Versorgungsbetriebe AG22 kW2 pointsdomestic socket, Type 2
    Directions

Recently opened

  • 28 Nov 2024 · Carl-Benz-Str. 16 · 350 kW · IONITY GmbH
  • 29 Mar 2023 · Dieselstraße 3 · 300 kW · Pfalzwerke AG
  • 6 Feb 2023 · Grabengasse 12 · 22 kW · Mainova AG
  • 6 Feb 2023 · Steigerweg 3 · 22 kW · Mainova AG
  • 6 Feb 2023 · Hessenring 5 · 22 kW · Mainova AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET