Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Harburg · Niedersachsen · Germany

EV charging stations in Rosengarten

44 public charging sites with 65 charge points are registered in Rosengarten, including 21 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 250 kW.

The largest operator is Wildpark Schwarze Berge GmbH & Co. KG with 30 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites44
Charge points65
DC fast points21
150 kW and up20

Charge points by power

≤ 11 kW1
12–22 kW42
23–49 kW0
50–149 kW2
≥ 150 kW20

Operators

Wildpark Schwarze Berge GmbH & Co. KG30
Tesla Germany GmbH16
EWE Go GmbH10
Stadtwerke Winsen (Luhe) GmbH6
Buchholz Digital GmbH2
Raik Szurlies1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Eckeler Str. 7, 21224 Rosengarten
    Tesla Germany GmbH250 kW16 pointsCCS24/7
    Directions
  • Eckeler Str. 7, 21224 Rosengarten
    EWE Go GmbH150 kW4 pointsCCS24/7
    Directions
  • Eckeler Straße 0, 21224 Rosengarten
    EWE Go GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Wildpark 1, 21224 Rosengarten
    Wildpark Schwarze Berge GmbH & Co. KG22 kW30 pointsType 2
    Directions
  • Metzendorfer Weg 32, 21224 Rosengarten
    Stadtwerke Winsen (Luhe) GmbH22 kW6 pointsType 224/7
    Directions
  • Am Kiekeberg 1, 21224 Rosengarten
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Bürgermeister-Glade-Str. 1, 21224 Rosengarten
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Kirchenstraße 2A, 21224 Rosengarten
    Buchholz Digital GmbH22 kW2 pointsType 2
    Directions
  • Schützengrund 11, 21224 Rosengarten
    Raik Szurlies11 kW1 pointsType 2
    Directions

Recently opened

  • 26 Jun 2025 · Eckeler Str. 7 · 250 kW · Tesla Germany GmbH
  • 3 May 2024 · Metzendorfer Weg 32 · 22 kW · Stadtwerke Winsen (Luhe) GmbH
  • 9 Jan 2023 · Schützengrund 11 · 11 kW · Raik Szurlies
  • 16 Dec 2022 · Am Wildpark 1 · 22 kW · Wildpark Schwarze Berge GmbH & Co. KG
  • 29 Aug 2022 · Eckeler Str. 7 · 150 kW · EWE Go GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET