Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Bamberg · Bayern · Germany

EV charging stations in Scheßlitz

23 public charging sites with 47 charge points are registered in Scheßlitz, including 9 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is Stadtwerke Bamberg with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points47
DC fast points9
150 kW and up6

Charge points by power

≤ 11 kW1
12–22 kW38
23–49 kW0
50–149 kW0
≥ 150 kW8

Operators

Stadtwerke Bamberg12
CHROFF12
MER Germany8
Motor-Nützel8
Hotel Schloss Burgellern4
ALDI SÜD2
Matthias Groh1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Oberend 29, 96110 Scheßlitz
    MER Germany150 kW8 pointsCCS24/7
    Directions
  • Am steinernen Kreuz 2, 96110 Scheßlitz
    Motor-Nützel22 kW8 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Gewerbepark 1, 96110 Scheßlitz
    Stadtwerke Bamberg22 kW12 pointsType 2
    Directions
  • Gewerbepark 1, 96110 Scheßlitz
    CHROFF22 kW12 pointsType 2
    Directions
  • Kirchplatz 1, 96110 Scheßlitz
    Hotel Schloss Burgellern22 kW4 pointsType 224/7
    Directions
  • Bamberger Straße 20A, 96110 Scheßlitz
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Küchelstraße 4, 96110 Scheßlitz
    Matthias Groh11 kW1 pointsType 2
    Directions

Recently opened

  • 24 Jun 2024 · Oberend 29 · 150 kW · MER Germany
  • 1 Nov 2023 · Kirchplatz 1 · 22 kW · Hotel Schloss Burgellern
  • 17 Oct 2023 · Gewerbepark 1 · 22 kW · Stadtwerke Bamberg
  • 23 Sept 2023 · Gewerbepark 1 · 22 kW · CHROFF
  • 23 Feb 2023 · Küchelstraße 4 · 11 kW · Matthias Groh

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET