EV charging stations in Schloß Holte-Stukenbrock
22 public charging sites with 47 charge points are registered in Schloß Holte-Stukenbrock, including 22 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Westfalen Weser Ladeservice GmbH with 18 charge points; 6 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Oerlinghauser Str. 33, 33758 Schloß Holte-StukenbrockDirections
- Sender Str. 8, 33758 Schloß Holte-StukenbrockDirections
- Marienstr. 0, 33758 Schloß Holte-StukenbrockDirections
- Lüchtenstr. 0, 33758 Schloß Holte-StukenbrockDirections
- Barbaraweg 0, 33758 Schloß Holte-StukenbrockDirections
- Bahnhofstr. 1, 33758 Schloß Holte-StukenbrockDirections
- Hauptstr. 43, 33758 Schloß Holte-StukenbrockDirections
Other charging sites
AC charge points, sorted by number of points.
- Grenzweg 1, 33758 Schloß Holte-StukenbrockDirections
- Liemker Straße 27, 33758 Schloß Holte-StukenbrockDirections
- An der Heller 53, 33758 Schloß Holte-StukenbrockDirections
- Marienstraße 11, 33758 Schloß Holte-StukenbrockDirections
- Hauptstr. 21, 33758 Schloß Holte-StukenbrockDirections
- Am Furlbach 33, 33758 Schloß Holte-StukenbrockDirections
- Lange Straße 15, 33758 Schloß Holte-StukenbrockDirections
Recently opened
- 14 Nov 2025 · Hauptstr. 43 · 50 kW · Autohaus Steinböhmer GmbH & Co. KG
- 24 Sept 2025 · Oerlinghauser Str. 33 · 400 kW · EnBW mobility+ AG und Co.KG
- 9 May 2025 · Barbaraweg 0 · 150 kW · Westfalen Weser Ladeservice GmbH
- 30 Apr 2025 · Marienstr. 0 · 150 kW · Westfalen Weser Ladeservice GmbH
- 28 Mar 2025 · Sender Str. 8 · 400 kW · EnBW mobility+ AG und Co.KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Gütersloh 262
- Rheda-Wiedenbrück 87
- Halle (Westf.) 69
- Rietberg 67
- Verl 46
- Borgholzhausen 40
- Harsewinkel 34
- Steinhagen 33
- Versmold 30
- Marienfeld 28
- Herzebrock-Clarholz 27
Data: official national charge point register (1 September 2026). Data sources