Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Kitzingen · Bayern · Germany

EV charging stations in Volkach

17 public charging sites with 36 charge points are registered in Volkach, including 2 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is ÜZ Mainfranken eG with 22 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites17
Charge points36
DC fast points2
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW34
23–49 kW0
50–149 kW2
≥ 150 kW0

Operators

ÜZ Mainfranken eG22
Robert Bosch GmbH6
Stadtwerke Würzburg AG2
N-ERGIE Aktiengesellschaft2
ALDI SÜD2
Campingplatz Escherndorf GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Kirchbergweg 6, 97332 Volkach
    Stadtwerke Würzburg AG50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Fahrer Straße 2, 97332 Volkach
    ÜZ Mainfranken eG22 kW8 pointsType 2
    Directions
  • Dimbacher Straße 44, 97332 Volkach
    Robert Bosch GmbH22 kW6 pointsType 2
    Directions
  • Am alten Bahnhof 8, 97332 Volkach
    ÜZ Mainfranken eG22 kW4 pointsType 2
    Directions
  • Georg-Berz-Straße 0, 97332 Volkach
    ÜZ Mainfranken eG22 kW2 pointsType 2
    Directions
  • Vogelsburg 1, 97332 Volkach
    N-ERGIE Aktiengesellschaft22 kW2 pointsType 2
    Directions
  • Gartenstraße 3, 97332 Volkach
    ÜZ Mainfranken eG22 kW2 pointsType 2
    Directions
  • Gartenstraße 5, 97332 Volkach
    ÜZ Mainfranken eG22 kW2 pointsType 2
    Directions
  • Gartenstr. 5, 97332 Volkach
    ÜZ Mainfranken eG22 kW2 pointsType 224/7
    Directions
  • Landstraße 14, 97332 Volkach
    ÜZ Mainfranken eG22 kW2 pointsType 2
    Directions
  • Im Seelein 24, 97332 Volkach
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • An der Güß 9a, 97332 Volkach
    Campingplatz Escherndorf GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 19 Feb 2026 · Dimbacher Straße 44 · 22 kW · Robert Bosch GmbH
  • 3 Dec 2025 · Kirchbergweg 6 · 50 kW · Stadtwerke Würzburg AG
  • 11 Jul 2024 · An der Güß 9a · 22 kW · Campingplatz Escherndorf GmbH
  • 20 Sept 2023 · Gartenstraße 3 · 22 kW · ÜZ Mainfranken eG
  • 20 Sept 2023 · Gartenstr. 5 · 22 kW · ÜZ Mainfranken eG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET