EV charging stations in Waltrop
25 public charging sites with 48 charge points are registered in Waltrop, including 7 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Wirelane GmbH with 26 charge points; 7 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Leveringhäuser Str. 134, 45731 WaltropDirections
- Am Moselbach 5-7, 45731 WaltropDirections
- Ottostr. 2, 45731 WaltropDirections
Other charging sites
AC charge points, sorted by number of points.
- Münsterstr. 1, 45731 WaltropDirections
- Tinkhofstraße 2, 45731 WaltropDirections
- Erlenweg 2, 45731 WaltropDirections
- Dresdener Str. 3, 45731 WaltropDirections
- Am Hebewerk 10, 45731 WaltropDirections
- Am Moselbach 11, 45731 WaltropDirections
- Akazienweg 13, 45731 WaltropDirections
- Am Mühlenteich 15, 45731 WaltropDirections
- Sandstraße 25, 45731 WaltropDirections
- Riphausstraße 33, 45731 WaltropDirections
- Mühlenstraße 61, 45731 WaltropDirections
- Nordring 70, 45731 WaltropDirections
- Dortmunder Str. 81, 45731 WaltropDirections
- Dortmunder Straße 130z, 45731 WaltropDirections
- Nordring 16b, 45731 WaltropDirections
- Egelmeer 6z, 45731 WaltropDirections
- Landabsatz 901z, 45731 WaltropDirections
- Goethestraße 96b, 45731 WaltropDirections
- Zum Schacht 3, 45731 WaltropDirections
- Sydowstraße 7, 45731 WaltropDirections
Recently opened
- 20 Jul 2026 · Leveringhäuser Str. 134 · 300 kW · Shell Deutschland GmbH
- 10 Apr 2026 · Am Hebewerk 10 · 22 kW · Wirelane GmbH
- 10 Apr 2026 · Am Mühlenteich 15 · 22 kW · Wirelane GmbH
- 26 Sept 2025 · Erlenweg 2 · 22 kW · Wirelane GmbH
- 26 Sept 2025 · Dresdener Str. 3 · 22 kW · Wirelane GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Castrop-Rauxel 266
- Recklinghausen 168
- Gladbeck 126
- Dorsten 124
- Haltern am See 78
- Marl 78
- Herten 72
- Oer-Erkenschwick 64
- Datteln 34
Data: official national charge point register (1 September 2026). Data sources