Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Isère · France

EV charging stations in Les Deux Alpes

10 public charging sites with 30 charge points are registered in Les Deux Alpes, including 8 DC fast-charging points. The most powerful points deliver up to 60 kW.

The largest operator is Réseau eborn with 16 charge points; 4 operators are present in total.

At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.

Sites10
Charge points30
DC fast points8
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW9
23–49 kW10
50–149 kW11
≥ 150 kW0

Operators

Réseau eborn16
Alizé Liberté 27
SATA 2 Alpes6
Freshmile France1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • 11 Place des 2 Alpes, Les Deux Alpes 38860 France
    Réseau eborn60 kW5 pointsCCS, domestic socket, Type 224/7
  • 1 Rue Saint-Claude, Les Deux Alpes 38860 France
    Réseau eborn60 kW3 pointsCCS, Type 224/7
  • 4 Route de Champame, Les Deux Alpes 38860 France
    Réseau eborn60 kW3 pointsCCS, Type 224/7
  • 354 D530, Les Deux Alpes 38860 France
    Réseau eborn24 kW3 pointsCCS, CHAdeMO, domestic socket, Type 224/7

Other charging sites

AC charge points, sorted by number of points.

  • [4 places des deux alpes][38860][Les Deux Alpes]
    SATA 2 Alpes22 kW6 pointsdomestic socket, Type 224/7
  • Promenade des Ecrins Le village 1, 38860 Les Deux Alpes
    Alizé Liberté 222.1 kW4 pointsType 2
    Directions
  • 18 AVENUE DE LA MUZELLE, 38860 LES DEUX ALPES
    Alizé Liberté 222.1 kW3 pointsType 2
    Directions
  • 51 Avenue de la Muzelle, Les Deux Alpes 38860 France
    Réseau eborn22 kW2 pointsdomestic socket, Type 224/7
  • 80 Avenue de la Muzelle, Les Deux Alpes 38860 France
    Freshmile France22 kW1 pointsdomestic socket, Type 224/7

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (15 October 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET