Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Rottal-Inn · Bayern · Germany

EV charging stations in Arnstorf

18 public charging sites with 32 charge points are registered in Arnstorf, including 2 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is VIOCON with 15 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points32
DC fast points2
150 kW and up2

Charge points by power

≤ 11 kW3
12–22 kW27
23–49 kW0
50–149 kW0
≥ 150 kW2

Operators

VIOCON15
Energie Südbayern GmbH10
Robert Albrecht3
Energielösung GmbH2
Lidl2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Unteres Schloß 6, 94424 Arnstorf
    Energie Südbayern GmbH150 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Industriestr. 2, 94424 Arnstorf
    VIOCON22 kW12 pointsType 224/7
    Directions
  • Eckerfeld 2, 94424 Arnstorf
    Energie Südbayern GmbH22 kW4 pointsType 2
    Directions
  • Kudlhub 3, 94424 Arnstorf
    VIOCON22 kW3 pointsType 2
    Directions
  • Hafnerstraße 7, 94424 Arnstorf
    Robert Albrecht11 kW3 pointsType 2
    Directions
  • Am Pfaffengraben 0, 94424 Arnstorf
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions
  • Am Pfaffengraben 1, 94424 Arnstorf
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions
  • Unteres Schloß 2, 94424 Arnstorf
    Energielösung GmbH22 kW2 pointsType 2
    Directions
  • Mariakirchner Str. 34, 94424 Arnstorf
    Lidl22 kW2 pointsType 2
    Directions

Recently opened

  • 21 Jul 2026 · Kudlhub 3 · 22 kW · VIOCON
  • 15 Dec 2025 · Industriestr. 2 · 22 kW · VIOCON
  • 25 Aug 2025 · Unteres Schloß 6 · 150 kW · Energie Südbayern GmbH
  • 1 Jan 2023 · Hafnerstraße 7 · 11 kW · Robert Albrecht
  • 5 Dec 2022 · Eckerfeld 2 · 22 kW · Energie Südbayern GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET