Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Dingolfing-Landau · Bayern · Germany

EV charging stations in Pilsting

15 public charging sites with 25 charge points are registered in Pilsting, including 21 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Shell Deutschland GmbH with 8 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites15
Charge points25
DC fast points21
150 kW and up18

Charge points by power

≤ 11 kW0
12–22 kW4
23–49 kW0
50–149 kW3
≥ 150 kW18

Operators

Shell Deutschland GmbH8
IONITY GmbH6
Fastned Deutschland GmbH & Co. KG4
Stoiber Photovoltaik GmbH3
Energie Südbayern GmbH2
EDEKA2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hietzingerwiesen 2a, 94431 Pilsting
    Shell Deutschland GmbH400 kW8 pointsCCS
    Directions
  • Pilsting 0
    IONITY GmbH350 kW6 pointsCCS24/7
    Directions
  • Hietzinger Wiesen 0, 94431 Pilsting
    Fastned Deutschland GmbH & Co. KG300 kW4 pointsCCS
    Directions
  • Waldstraße 2, 94431 Pilsting
    Stoiber Photovoltaik GmbH50 kW3 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Köllnbacher Str. 1, 94431 Pilsting
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions
  • Landshuter Straße 31, 94431 Pilsting
    EDEKA22 kW2 pointsType 2
    Directions

Recently opened

  • 29 May 2026 · Hietzingerwiesen 2a · 400 kW · Shell Deutschland GmbH
  • 22 Dec 2023 · Waldstraße 2 · 50 kW · Stoiber Photovoltaik GmbH
  • 1 Aug 2023 · Pilsting 0 · 350 kW · IONITY GmbH
  • 13 Mar 2023 · Landshuter Straße 31 · 22 kW · EDEKA
  • 17 Nov 2022 · Hietzinger Wiesen 0 · 300 kW · Fastned Deutschland GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET