Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ravensburg · Baden-Württemberg · Germany

EV charging stations in Aulendorf

14 public charging sites with 28 charge points are registered in Aulendorf, including 3 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is Spähn Betriebs-GmbH with 8 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites14
Charge points28
DC fast points3
150 kW and up2

Charge points by power

≤ 11 kW0
12–22 kW26
23–49 kW0
50–149 kW0
≥ 150 kW2

Operators

Spähn Betriebs-GmbH8
EnBW mobility+ AG und Co.KG4
Energie Südbayern GmbH4
Wirelane GmbH4
STADTWERK MOBILITY PLUS GmbH & Co. KG4
Allego2
Autohaus Moser GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Poststr. 22, 88326 Aulendorf
    Allego150 kW2 pointsCCS
    Directions
  • Rugetsweiler Straße 1, 88326 Aulendorf
    Autohaus Moser GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Im Gumpen 5, 88326 Aulendorf
    Spähn Betriebs-GmbH22 kW8 pointsType 2
    Directions
  • Parkstr. 1, 88326 Aulendorf
    EnBW mobility+ AG und Co.KG22 kW4 pointsdomestic socket, Type 2
    Directions
  • Schussenrieder Str. 9, 88326 Aulendorf
    Energie Südbayern GmbH22 kW4 pointsType 224/7
    Directions
  • Poststr. 0, 88326 Aulendorf
    STADTWERK MOBILITY PLUS GmbH & Co. KG15 kW4 pointsType 2
    Directions
  • Waldseer Str. 11, 88326 Aulendorf
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Hermann-Lanz-Straße 21, 88326 Aulendorf
    Wirelane GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 10 Jun 2026 · Waldseer Str. 11 · 22 kW · Wirelane GmbH
  • 10 Jun 2026 · Hermann-Lanz-Straße 21 · 22 kW · Wirelane GmbH
  • 3 Sept 2024 · Schussenrieder Str. 9 · 22 kW · Energie Südbayern GmbH
  • 18 Aug 2023 · Poststr. 22 · 150 kW · Allego
  • 31 May 2023 · Im Gumpen 5 · 22 kW · Spähn Betriebs-GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET