Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Breisgau-Hochschwarzwald · Baden-Württemberg · Germany

EV charging stations in Bad Krozingen

21 public charging sites with 41 charge points are registered in Bad Krozingen, including 7 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is badenova AG & Co. KG with 10 charge points; 10 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points41
DC fast points7
150 kW and up4

Charge points by power

≤ 11 kW5
12–22 kW30
23–49 kW0
50–149 kW2
≥ 150 kW4

Operators

badenova AG & Co. KG10
naturenergie8
Bidirex GmbH8
Wirelane GmbH4
Shell Deutschland GmbH2
EWE Go GmbH2
Pluq2
Annegret Litz2
Autohaus Krüger GmbH2
Marlies Lorenz1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Am Alamannenfeld 1, 79189 Bad Krozingen
    Shell Deutschland GmbH150 kW2 pointsCCS
    Directions
  • Freiburger Str. 25, 79189 Bad Krozingen
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions
  • Norsinger Str. 2, 79189 Bad Krozingen
    naturenergie50 kW2 pointsCCS24/7
    Directions
  • Tulpenbaumallee 55, 79189 Bad Krozingen
    Autohaus Krüger GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Herbert-Hellmann-Allee 44, 79189 Bad Krozingen
    badenova AG & Co. KG22 kW6 pointsType 224/7
    Directions
  • Thürachstr. 4, 79189 Bad Krozingen
    badenova AG & Co. KG22 kW4 pointsType 224/7
    Directions
  • Thürachstraße 3, 79189 Bad Krozingen
    Wirelane GmbH11 kW4 pointsType 2
    Directions
  • Norsinger Strasse 2, 79189 Bad Krozingen
    naturenergie22 kW2 pointsdomestic socket, Type 2
    Directions
  • Rimsinger Str. 2, 79189 Bad Krozingen
    naturenergie22 kW2 pointsType 224/7
    Directions
  • Blauenstraße 6, 79189 Bad Krozingen
    Bidirex GmbH22 kW2 pointsType 2
    Directions
  • Thürachstr. 10, 79189 Bad Krozingen
    Pluq22 kW2 pointsType 224/7
    Directions
  • Südring 11, 79189 Bad Krozingen
    Bidirex GmbH22 kW2 pointsType 2
    Directions
  • Johanniterstr. 17, 79189 Bad Krozingen
    naturenergie22 kW2 pointsType 224/7
    Directions
  • Carl-Orff-Str 33, 79189 Bad Krozingen
    Annegret Litz22 kW2 pointsType 2
    Directions
  • Tunibergstraße 2b, 79189 Bad Krozingen
    Bidirex GmbH22 kW2 pointsType 2
    Directions
  • Willhelm-Schneider-Str. 3a, 79189 Bad Krozingen
    Bidirex GmbH22 kW2 pointsType 2
    Directions
  • Clara-Schumann-Straße 8, 79189 Bad Krozingen
    Marlies Lorenz11 kW1 pointsType 2
    Directions

Recently opened

  • 1 Apr 2026 · Thürachstr. 4 · 22 kW · badenova AG & Co. KG
  • 24 Mar 2026 · Rimsinger Str. 2 · 22 kW · naturenergie
  • 24 Mar 2026 · Johanniterstr. 17 · 22 kW · naturenergie
  • 27 Aug 2025 · Herbert-Hellmann-Allee 44 · 22 kW · badenova AG & Co. KG
  • 25 Jul 2025 · Am Alamannenfeld 1 · 150 kW · Shell Deutschland GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out