Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Breisgau-Hochschwarzwald · Baden-Württemberg · Germany

EV charging stations in Bötzingen

15 public charging sites with 26 charge points are registered in Bötzingen, including 7 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Team-Emobility GmbH with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites15
Charge points26
DC fast points7
150 kW and up4

Charge points by power

≤ 11 kW3
12–22 kW7
23–49 kW12
50–149 kW0
≥ 150 kW4

Operators

Team-Emobility GmbH12
Aral Pulse4
Elektro Schönberger GmbH & Co.KG3
BMW Autohaus Märtin GmbH2
ALDI SÜD2
Schulz GmbH2
naturenergie1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Schloßmattenstr. 5, 79268 Bötzingen
    Aral Pulse300 kW4 pointsCCS
    Directions
  • Allmendweg 1, 79268 Bötzingen
    Team-Emobility GmbH39 kW10 pointsCCS, Type 2
    Directions
  • Allmendweg 2, 79268 Bötzingen
    Team-Emobility GmbH39 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Frohmattenstr. 2a, 79268 Bötzingen
    Elektro Schönberger GmbH & Co.KG11 kW3 pointsType 224/7
    Directions
  • Allmendweg 1, 79268 Bötzingen
    BMW Autohaus Märtin GmbH22 kW2 pointsType 2
    Directions
  • Schloßmattenstr. 11, 79268 Bötzingen
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Hauptstraße 73, 79268 Bötzingen
    Schulz GmbH22 kW2 pointsType 2
    Directions
  • Hauptstr. 11, 79268 Bötzingen
    naturenergie22 kW1 pointsType 224/7
    Directions

Recently opened

  • 4 Jun 2025 · Frohmattenstr. 2a · 11 kW · Elektro Schönberger GmbH & Co.KG
  • 4 Dec 2024 · Hauptstr. 11 · 22 kW · naturenergie
  • 31 Oct 2024 · Schloßmattenstr. 5 · 300 kW · Aral Pulse
  • 1 Oct 2024 · Schloßmattenstr. 11 · 22 kW · ALDI SÜD
  • 12 Apr 2024 · Hauptstraße 73 · 22 kW · Schulz GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET