EV charging stations in Bad Neuenahr-Ahrweiler
31 public charging sites with 57 charge points are registered in Bad Neuenahr-Ahrweiler, including 8 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 200 kW.
The largest operator is SimplyCharge with 17 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rathausstraße 34, 53474 Bad Neuenahr-AhrweilerDirections
- Ahrweilerstr. 50, 53474 Bad Neuenahr-AhrweilerDirections
- Am Silberberg 2, 53474 Bad Neuenahr-AhrweilerDirections
Other charging sites
AC charge points, sorted by number of points.
- Bergstr. 12, 53474 Bad Neuenahr-AhrweilerDirections
- Hauptstr. 119, 53474 Bad Neuenahr-AhrweilerDirections
- Altenbaustr. 1, 53474 Bad Neuenahr-AhrweilerDirections
- Hochstadenstraße 27, 53474 Bad Neuenahr-AhrweilerDirections
- Bergstr. 6, 53474 Bad Neuenahr-AhrweilerDirections
- Altenbaustraße 0, 53474 Bad Neuenahr-AhrweilerDirections
- Telegrafenstraße 0, 53474 Bad Neuenahr-AhrweilerDirections
- Wilhelmstraße 1, 53474 Bad Neuenahr-AhrweilerDirections
- Staufenstraße 3, 53474 Bad Neuenahr-AhrweilerDirections
- Schülzchenstr. 8, 53474 Bad Neuenahr-AhrweilerDirections
- Dahlienweg 25, 53474 Bad Neuenahr-AhrweilerDirections
- Wilhelmstraße 36, 53474 Bad Neuenahr-AhrweilerDirections
- Hauptstraße 60, 53474 Bad Neuenahr-AhrweilerDirections
- Wilhelmstraße 24-30, 53474 Bad Neuenahr-AhrweilerDirections
- Wilhelmstr. 1, 53474 Bad Neuenahr-AhrweilerDirections
- Bonner Str. 30a, 53474 Bad Neuenahr-AhrweilerDirections
- Schützbahn 38, 53474 Bad Neuenahr-AhrweilerDirections
- Alte Ziegelei 62, 53474 Bad Neuenahr-AhrweilerDirections
Recently opened
- 12 May 2026 · Rathausstraße 34 · 200 kW · EnBW mobility+ AG und Co.KG
- 6 Apr 2026 · Bergstr. 6 · 22 kW · SimplyCharge
- 25 Feb 2026 · Altenbaustr. 1 · 22 kW · SimplyCharge
- 24 Feb 2026 · Ahrweilerstr. 50 · 60 kW · Lidl
- 2 Feb 2026 · Bergstr. 12 · 22 kW · SimplyCharge
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Nürburg 42
- Sinzig 35
- Remagen 32
- Meckenheim 51
- Rheinbach 50
- Bad Honnef 74
- Königswinter 112
- Bonn 1,212
- Baar 32
- Andernach 62
- Bad Münstereifel 33
- Mayen 57
Data: official national charge point register (1 September 2026). Data sources