Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Main-Taunus-Kreis · Hessen · Germany

EV charging stations in Bad Soden am Taunus

23 public charging sites with 36 charge points are registered in Bad Soden am Taunus, including 9 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Wirelane GmbH with 14 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points36
DC fast points9
150 kW and up6

Charge points by power

≤ 11 kW12
12–22 kW14
23–49 kW2
50–149 kW2
≥ 150 kW6

Operators

Wirelane GmbH14
Mainova AG6
E-Merge Mobility GmbH5
HomE of Mobility GmbH3
Volpert & Bisinger3
ALDI SÜD2
Klaus Viel1
Patrick Franitza1
Frankfurter Volksbank eG1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Königsteiner Str. 15, 65812 Bad Soden am Taunus
    Mainova AG300 kW4 pointsCCS24/7
    Directions
  • Am Schnittelberg 1-3, 65812 Bad Soden am Taunus
    Mainova AG150 kW2 pointsCCS
    Directions
  • Friedrich-Uhde-Str. 8, 65812 Bad Soden am Taunus
    ALDI SÜD50 kW2 pointsCCS
    Directions
  • Schubertstraße 2, 65812 Bad Soden am Taunus
    HomE of Mobility GmbH24 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Bahnhof 4, 65812 Bad Soden am Taunus
    E-Merge Mobility GmbH11 kW5 pointsType 224/7
    Directions
  • Ulmenstraße 1, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Neuenhainer Straße 2, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Richard-Wagner-Str. 2, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 224/7
    Directions
  • Falkenstraße 3, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Altkönigstraße 7, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Mozartstraße 30, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Kelkheimer Str 72-74, 65812 Bad Soden am Taunus
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Königsteiner Str. 7, 65812 Bad Soden am Taunus
    Volpert & Bisinger11 kW2 pointsType 2
    Directions
  • Schubertstr. 2, 65812 Bad Soden am Taunus
    HomE of Mobility GmbH11 kW1 pointsType 224/7
    Directions
  • Schubertstr. 2, 65812 Bad Soden am Taunus
    Volpert & Bisinger11 kW1 pointsType 224/7
    Directions
  • Freiligrathstrasse 26, 65812 Bad Soden am Taunus
    Klaus Viel11 kW1 pointsType 2
    Directions
  • Am Hübenbusch 30, 65812 Bad Soden am Taunus
    Patrick Franitza11 kW1 pointsType 2
    Directions
  • Hauptstraße 43, 65812 Bad Soden am Taunus
    Frankfurter Volksbank eG11 kW1 pointsType 2
    Directions

Recently opened

  • 27 Jan 2026 · Königsteiner Str. 7 · 11 kW · Volpert & Bisinger
  • 27 Jan 2026 · Schubertstr. 2 · 11 kW · Volpert & Bisinger
  • 8 Sept 2025 · Königsteiner Str. 15 · 300 kW · Mainova AG
  • 10 Jul 2025 · Friedrich-Uhde-Str. 8 · 50 kW · ALDI SÜD
  • 27 May 2025 · Am Bahnhof 4 · 11 kW · E-Merge Mobility GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET