Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Main-Taunus-Kreis · Hessen · Germany

EV charging stations in Hofheim

18 public charging sites with 38 charge points are registered in Hofheim, including 18 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Citywatt GmbH with 10 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points38
DC fast points18
150 kW and up12

Charge points by power

≤ 11 kW4
12–22 kW14
23–49 kW0
50–149 kW6
≥ 150 kW14

Operators

Citywatt GmbH10
METZ Energy GmbH6
Süwag Vertrieb AG & Co. KG6
Pfalzwerke AG4
SolarInvest Main-Taunus eG4
Taunus Sparkasse4
Mainova AG2
Autohaus Euler GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Casteller Str. 97, 65719 Hofheim
    Citywatt GmbH300 kW10 pointsCCS
    Directions
  • Nordring 5-9, 65719 Hofheim
    Pfalzwerke AG150 kW4 pointsCCS, Type 2
    Directions
  • Lorsbacher Straße 12, 65719 Hofheim
    METZ Energy GmbH50 kW2 pointsCCS
    Directions
  • Eichstraße 23, 65719 Hofheim
    METZ Energy GmbH50 kW2 pointsCCS
    Directions
  • Nordring 2d, 65719 Hofheim
    METZ Energy GmbH50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Alten Bach 11, 65719 Hofheim
    SolarInvest Main-Taunus eG22 kW4 pointsType 2
    Directions
  • Kellereiplatz 1, 65719 Hofheim
    Taunus Sparkasse11 kW4 pointsType 2
    Directions
  • Frankfurter Str. / Kreishaus 0, 65719 Hofheim
    Süwag Vertrieb AG & Co. KG22 kW2 pointsType 2
    Directions
  • Hattersheimer Straße 9, 65719 Hofheim
    Süwag Vertrieb AG & Co. KG22 kW2 pointsType 2
    Directions
  • Frankfurter Str. 80, 65719 Hofheim
    Süwag Vertrieb AG & Co. KG22 kW2 pointsType 2
    Directions
  • Am Kreishaus 1-5, 65719 Hofheim
    Mainova AG22 kW2 pointsType 2
    Directions
  • Nordring 15-21, 65719 Hofheim
    Autohaus Euler GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 16 May 2024 · Am Kreishaus 1-5 · 22 kW · Mainova AG
  • 15 May 2024 · Am Alten Bach 11 · 22 kW · SolarInvest Main-Taunus eG
  • 1 Mar 2024 · Lorsbacher Straße 12 · 50 kW · METZ Energy GmbH
  • 1 Mar 2024 · Eichstraße 23 · 50 kW · METZ Energy GmbH
  • 1 Mar 2024 · Nordring 2d · 50 kW · METZ Energy GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET