EV charging stations in Bad Wünnenberg
21 public charging sites with 42 charge points are registered in Bad Wünnenberg, including 2 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 200 kW.
The largest operator is Westfalen Weser Ladeservice GmbH with 26 charge points; 5 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Iserkuhle 3, 33181 Bad WünnenbergDirections
Other charging sites
AC charge points, sorted by number of points.
- Zinsdorfer Weg 8, 33181 Bad WünnenbergDirections
- Glashüttenweg 1, 33181 Bad WünnenbergDirections
- Wiesenweg 1, 33181 Bad WünnenbergDirections
- Im Aatal 1, 33181 Bad WünnenbergDirections
- In den Erlen 2, 33181 Bad WünnenbergDirections
- Kolpingstr. 5, 33181 Bad WünnenbergDirections
- Am Kirchplatz 6, 33181 Bad WünnenbergDirections
- Haarener Straße 7, 33181 Bad WünnenbergDirections
- Wewelsburger Str. 8, 33181 Bad WünnenbergDirections
- An der Kirche 8, 33181 Bad WünnenbergDirections
- Westfalenstraße 9, 33181 Bad WünnenbergDirections
- Leiberger Str. 10, 33181 Bad WünnenbergDirections
- Poststr. 15, 33181 Bad WünnenbergDirections
- In den Erlen 20, 33181 Bad WünnenbergDirections
- In den Erlen 31, 33181 Bad WünnenbergDirections
- Hauptstraße 42, 33181 Bad WünnenbergDirections
- Kirchweg 80, 33181 Bad WünnenbergDirections
- Im Aatal 80, 33181 Bad WünnenbergDirections
- Gartenweg 11, 33181 Bad WünnenbergDirections
- Kampstraße 31, 33181 Bad WünnenbergDirections
Recently opened
- 15 Oct 2025 · Poststr. 15 · 22 kW · Westenergie Metering GmbH
- 15 Oct 2025 · In den Erlen 20 · 22 kW · Westenergie Metering GmbH
- 14 Oct 2025 · Im Aatal 1 · 22 kW · Westenergie Metering GmbH
- 14 Oct 2025 · Leiberger Str. 10 · 22 kW · Westenergie Metering GmbH
- 29 Aug 2024 · Iserkuhle 3 · 200 kW · Westenergie Metering GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Paderborn 617
- Büren 68
- Salzkotten 56
- Bad Lippspringe 47
- Delbrück 42
- Borchen 29
- Hövelhof 26
Data: official national charge point register (1 September 2026). Data sources